20
5. OPERATION
Precautions:
Only qualified personnel acquainted with the design
and construction of the shelter should handle it.
Prior to operation carefully inspect the dock shelter.
Never use it in case any damage is found.
Principle of operation:
Trailers back into the shelter during loading/unloading
operations while top and side air bags create a tight
seal against the truck top and rear body.
WARNING!
To prevent dock shelter damage truck size should correspond to shelter type and dimensions.
1. Position the trailer in the middle of the dock shelter.
2. Back the trailer slowly till it contacts with dock bumpers.
3. Make sure the truck is stationary, the handbrake is put
on, the wheels are choked.
4. Inflate dock shelter:
– switch the blower on by pressing a push-button on
the control unit;
– if the blower motor is operated with the dock leveler
control unit then press a corresponding dock shelter
button on the unit;
– after the blower is operated, top and side air bags
are inflated.
5. Deflate dock shelter.
– switch the blower off by pressing a push-button on
the control unit;
– if the blower motor is operated with the dock leveler
control unit then press a corresponding dock shelter
button on the unit;
– wait the air bags to deflate, retract, and store behind
storage curtains;
– the trailer may depart now.
OPERA
TION
WARNING!
The blower should be on during whole loading/unloading cycle!
The trailer should exit the loading dock only after air bags are completely deflated and stored!
Содержание DSHINF Series
Страница 7: ...7 INSTALLATION Fig 2 View 2 Fig 2 1 View 2 105 mm Fig 2 2...
Страница 9: ...9 INSTALLATION Fig 4 3 View 2 Fig 4 1 View 1 Fig 4 Fig 4 4 Fig 4 2 100 mm 300 mm View 1 View 2...
Страница 10: ...10 INSTALLATION Fig 5 Fig 5 2 Fig 5 3 Fig 5 1...
Страница 11: ...11 INSTALLATION Fig 6 Install top air bag Fig 6 1 Fig 6 2...
Страница 12: ...12 Fig 7 Install guide rod Fig 7 1 Fig 7 2 Fig 7 3 INSTALLATION...
Страница 13: ...13 INSTALLATION Fig 8 Fig 9 Fig 10 400 mm 155 mm 90 820 mm...
Страница 15: ...15 INSTALLATION Fig 14 Connect air transfer tubes Fig 14 1 Fig 14 2 B...
Страница 16: ...16 INSTALLATION Fig 15 Fig 15 1 Fig 15 2 Fig 15 4 Fig 15 3 Fig 15 5 E D D D...
Страница 17: ...17 Fig 16 Fig 16 1 Fig 16 2 INSTALLATION B B...
Страница 18: ...18 Fig 17 Fig 17 1 Fig 17 2 INSTALLATION B B...
Страница 19: ...19 Fig 18 Fig 20 Fig 19 Fig 21 INSTALLATION 4 2 u 32 mm C...
Страница 30: ...30 NOTES...
Страница 31: ...NOTES 31...