background image

 

VER 3.0 

 01/2020 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AD 350 

 

USER MANUAL 

 

Содержание BOFA AD 350

Страница 1: ...VER 3 0 01 2020 AD 350 USER MANUAL...

Страница 2: ...anel 1 01 02 Important safety notes Safety labels 2 01 Unpacking and unit placement 3 01 Turning extractor on adjusting airflow 5 01 02 Cleaning the unit Filter replacement 6 Consumable spares filter...

Страница 3: ...Overview Control Panel Feet Clips Handles 01 1...

Страница 4: ...Overview Air Inlet Mains Inlet Signal Cable Inlet Air Outlet Motor Cooling ON OFF Switch 02 1...

Страница 5: ...Overview Flow Adjustment Company Branding Filter Blocked Filter 75 full System Running Clean VOC Alarm 03 1...

Страница 6: ...supply before removing the pump motor access panel 2 Use only as described in this manual 3 Connect the system to a properly grounded outlet Dangers to eyes breathing and skin Once used the filters w...

Страница 7: ...t the extraction unit including Company name Address Contact number Extractor model Unit serial number Operating voltage range Maximum current load Operating frequency Year of Manufacture Relevant app...

Страница 8: ...gases or with particulates which can be pyrophoric can spontaneously ignite without implementation of additional precautions It is essential that nozzles or other extraction fume capture devices and h...

Страница 9: ...0 mm space is available around any vented panels on the extractor to ensure adequate airflow 2 Check the filter is located in its correct position before replacing the lid and securing the clips Cauti...

Страница 10: ...uld be kept to a minimum where possible to prevent the fume being blown away from the nozzle High speed lines may need bigger scoops or nozzles both sides of the product because of the turbulence caus...

Страница 11: ...replaced by a BOFA engineer as an electrical safety test may be required after replacement The unit MUST be connected to a properly earthed outlet If your system was ordered with any optional extras p...

Страница 12: ...ther DC voltage input or the Volt free input The override feature can be toggled On Off by a switch mounted on the internal motor access panel see below for switch location Switch in On position In th...

Страница 13: ...correct flow is maintained to compensate for any loss in performance caused by the added restriction of the partially blocked filters The extractor and all pipe work must be fully installed and conne...

Страница 14: ...e of unauthorised replacement filters may result in a potentially dangerous situation and or damage to the extractor unit and will invalidate the manufacturer s warranty Cleaning the unit The powder c...

Страница 15: ...e detailed below 1 Isolate the electrical supply to the extractor 2 Undo the two clips on the sides of the unit and remove the motor section using the two handles on the sides of the lid 3 Lift the fi...

Страница 16: ...Date Engineer Combined Filter Date Engineer Filter disposal The combined filter is manufactured from non toxic materials Filters are not re usable cleaning used filters is not recommended The method o...

Страница 17: ...E UL cUL Size Metric mm Imperial inches Height 590 23 2 Depth 465 18 3 Width 405 15 9 Filters Filter Type Surface area Efficiency Pre Filter 6m2 95 0 9 microns HEPA Filter Combined filter 2 1 m2 99 99...

Страница 18: ...Dorset BH17 7DU UK Tel 44 0 1202 699 444 Email sales bofa co uk German Office Sudring 62 D 21465 Wentorf bei Hamburg Germany Tel 49 0 40 739 3735 15 Email vertrieb bofa co uk BOFA Americas Inc 303 S...

Страница 19: ......

Страница 20: ...ocal Exhaust Ventilation Systems Company System Designation System Installation Date Designated Person Inspection and Maintenance Schedules 1 Daily checks 2 Weekly inspection of process enclosure extr...

Страница 21: ...not recorded 2 Weekly Inspection Weekly inspection by supervisor of physical condition of extract devices nozzles enclosures hoses and extraction unit for damage change parts added or removed and corr...

Страница 22: ...s and extraction unit for damage change parts added or removed and correct operation etc Check also that daily inspections have been completed Tick boxes to confirm system ok change Add details of any...

Страница 23: ...ges to Engineering Manager Record any remedial actions taken Month number Date System ok System Change Details of change repairs etc Initial 1 2 3 4 5 6 7 8 9 10 11 12 4 Yearly Inspection Annual servi...

Отзывы: