WSO Mist Collector, WSO 20, 25-1, 25-2, and 25-3
22
1/8-in NPT x 90°
male elbow
clean-air plenum pressure
tap location
1/8-in NPT adapter
1/8-in NPT adapter
plenum tap location
3/8-in flat washer
1/8-in NPT coupling
mounting bracket
#6-32 x 1/4-in mounting screws
support structure
mounting surface
Magnehelic gauge
high-pressure port
low-pressure port
two, 1/8-in NPT
adapters
plastic tubing
two, 1/8-in NPT pipe plugs
two, self-drilling screws
1/8-in NPT x 90° male elbow
dirty-air plenum pressure tap location
3/8-in flat washer
1/8-in NPT adapter
1/8-in NPT x 90° elbow
static pressure tee
Remote-Mount Magnehelic Gauge
7. Thirty-five feet of plastic tubing is supplied and
must be cut in two sections. Connect one section
of tubing from the gauge’s high-pressure port to
the pressure fitting located in the dirty-air plenum.
Connect remaining tubing from the gauge’s low-
pressure port to the fitting in the clean-air plenum.
Additional tubing can be ordered from your
representative.
8. Zero and maintain the gauge as directed in the
manufacturer’s Operating and Maintenance
Instructions provided.
Содержание WSO 20
Страница 1: ...IOM AK0300801 ENG Revision 3...
Страница 5: ...200 Volt 380 Volt 3 Ph 50Hz 60 Hz...
Страница 27: ......
Страница 31: ......