Bin Vent, Models TBV-2, TBV-4, and TBV-6
25
Power Pack Assembly
The 1 HP through 5 HP power packs are designed
to be side-mounted at the rear of the unit. The fan
blower housing is factory mounted to the unit.
The blower/motor pack can be installed at any time
during installation of the TBV. If the TBV needs
to be moved or lifted after the blower/motor pack
has been installed, special precautions and careful
handling need to be observed to prevent overturning.
A crane or forklift is
recommended for unloading,
assembly and installation of the TBV
The TBV has an off-center, high center of
gravity when the blower/motor pack is
assembled to the unit.
Careful handling is required to avoid
overturning the unit during movement.
NOTICE
Radial Blade Power Pack Installation
When installing your blower/
motor pack:
Use proper equipment and safety guidelines
when lifting and installing.
Rotate fan wheel before and after installing
into blower housing to assure proper
clearance.
A qualified electrician MUST wire the
motor to its electrical source.
Fan wheel rotation is clockwise.
To avoid water damage, do not direct the
fan blower housing outlet straight up into
the sky.
Содержание TBV-2