background image

 

- 3 -

In addition, the boiler is provided with two terminals for the room thermostat connection 
(see Electrical Diagram). For that, the bridge joining both terminals 

3-4

 is to be removed 

and the room thermostat is to be connected there. 

1.5.- Burner mounting 

The model 

Sirena

 is supplied with an oil burner 

Domestic

. Follow the next instructions 

to mount the burner over the boiler: 

- Dismount the cover of the oil combustion chamber. 

- Cut the insolation, which covers the hole of the combustion chamber, with a cutter. 

- Follow the installation guide included with the burner to install the oil circuit. 

- The boiler is provided with two terminals 

5 - 6

 for the burner electrical connection. 

1.6.- Draught regulator mounting 

To mount the draught regulator supplied with the boiler, follow carefully the next steps: 

- Keeping the boiler empty of water, screw the draught regulator in the hole provided 

in the boiler for such a purpose, ensuring a good sealed of it. 

- Introduce the hexagonal lever through the lateral hole displacing the plastic tube 

and placing the lever over the horizontal plane. 

- Slide the lever in such a position that allows to open and close the boiler charge 

door. 

- Fix the lever with the screw. 

- Ignite the boiler and wait for the temperature reaches the desired one in the 

thermometer. 

- Then turn the draught regulator up to the temperature shown in the thermometer. 

- With the principal air inlet-door closed fix the chain with it and leave it tight. 

2.- INSTALLATION WATER-FILLING 

Water filling is to be carried out slowly and with the air vent open, so that the installation air 
will be released. In addition, the other parts of the installation are to be properly purged by 
means of the air vent valves fitted for such a purpose. Once the installation has been filled 
up, close the filling valve. 

NOTE: Switching on the boiler without water could result in serious damage to it. 

3.- SAFETY LOCKING 

The boiler is provided with two types of operating safety locking: 

3.1.- Temperature safety locking 

It will occur every time the temperature in the boiler exceeds 110º C. The safety 
thermostat built-in button will be pressed in order to unlock it, once the plug covering 
this button has been previously loosened. 

Содержание granada

Страница 1: ...ALLATION AND OPERATING INSTRUCTIONS GRANADA This instruction manual includes all the details necessary for the proper installation and use of the boiler We thank you for having chosen a DOMUSA TEKNIK boiler ...

Страница 2: ...EGULATOR MOUNTING 3 2 INSTALLATION WATER FILLING 3 3 SAFETY LOCKING 3 3 1 TEMPERATURE SAFETY LOCKING 3 3 2 BURNER LOCKING 4 4 BOILER OPERATING 4 4 1 OPERATING WITH FIREWOOD 4 4 2 OPERATING WITH OIL BURNER 4 5 BOILER STOP 4 6 EQUIPMENT DELIVERY 4 7 BOILER MAINTENANCE 4 8 DIMENSIONS 5 9 ELECTRICAL DIAGRAM 6 10 FAILURES 7 10 1 BURNER FAILURES 7 10 2 BOILER FAILURES 7 ...

Страница 3: ...d it will never be less than the boiler outlet diameter Note If the design of the uptake is not capable of generate the necessary depression it can be possible to have a reduction in the quantity of combustion air reducing the heating output kW produced by the boiler 1 3 Hydraulic installation The hydraulic installation is to be carried out by skilled personnel complying with the installation stan...

Страница 4: ...isplacing the plastic tube and placing the lever over the horizontal plane Slide the lever in such a position that allows to open and close the boiler charge door Fix the lever with the screw Ignite the boiler and wait for the temperature reaches the desired one in the thermometer Then turn the draught regulator up to the temperature shown in the thermometer With the principal air inlet door close...

Страница 5: ...rder to switch on the boiler The burner will be put on The burner will stop when the boiler has reached the temperature selected in the control thermostat 5 BOILER STOP Set the main selector to ON position in order to switch on the boiler 6 EQUIPMENT DELIVERY The Technical Assistance Service once the first start up has been carried out will explain the boiler operation to the users by informing th...

Страница 6: ... 5 8 DIMENSIONS 290 VS IC RC 180 700 1330 1075 650 235 160 255 1000 IC Heating outlet RC Heating inlet VS Pressure relief valve ...

Страница 7: ... 6 9 ELECTRICAL DIAGRAM 1 2 3 4 5 6 B RT 1 C IG 2 C TC TS Black Red Green 7 8 1 2 5 Blue Brown Blue White P B Burner P Pump RT Room thermostat TC Control thermostat TS Security thermostat ...

Страница 8: ...Replace FREQUENT Flame sensor dirty Clean LOCKING Fume circuit clogged Clean Oil filter or burner pump dirty Clean 10 2 Boiler failures FAILURE CAUSE REMEDY RADIATOR The pump does not rotate Unlock the pump DOES NOT HEAT Air in hydraulic circuit Purge the installation and boiler The air vent plug is always to be loose Poorly adjusted burner Adjust properly EXCESSIVE There is no sealing on the upta...

Отзывы: