26
The gas connection to the appliance is effected by means of a suitable
coupling tube fitting L8, DIN 2353-ST, complying with European Standard
EN 1949 (e.g. Ermeto).
The gas connection may only be carried out by a qualified personnel.
Following proper installation, a testing for
leakage and a flame test must be carried
out by *qualified personnel in compliance
with EN1949 .
A certificate of testing must be issued.
* qualified personnel
Qualified personnel are accredited experts who
are able, by virtue of their training and knowledge,
to vouch for the correct implementation of the lea-
kage test.
The refrigerator must be equipped with a
gas cock (C) in the supply line to allow the
supply to be disconnected. Such a cutout
device must be readily accessible to the user.
SW 14
SW 17
C
Gas pressure
Category I
3P(30)
I
3P(37)
I
3P(50)
I
3+
I
3B/P(50)
I
3B/P(30)
mbar 30
37
50
28-37
30-37
50
30
BE
•
DK
•
DE
•
•
FI
•
FR
•
GR
•
•
IE
•
•
IS
•
IT
•
LU
•
•
NL
•
•
NO
•
AT
•
•
PT
•
•
SE
•
CH
•
•
ES
•
UK
•
•
•
Содержание Type C40/110
Страница 29: ...29...
Страница 30: ...Dometic GmbH In der Steinwiese 16 D 57074 Siegen www dometic com...