gpelectric.com | [page 15]
4.8 INITIAL CONNECTION AND OPERATING
1. Check all electrical connections and ensure all cables are securely fastened
2. Install the Fuse into the fuse holder, ensure the fuse holder is securely fastened
3. Remove the opaque material from the solar panels
4. Follow the solar charge controller user manual and operating steps
4.9 BATTERY BANK CONFIGURATIONS
INSTALLATION
Ring
Terminal
Legend
Ring
Terminal
Cable
Fuse
Fuse
Fuse
Fuse
6V
200A/hr @ 6V
6V
200A/hr @ 6V
Series: 2 x 6V
System Voltage = 12V
System Capacity =
200A/Hr
Series & Parallel: 4 x 6V
System Voltage = 12V
System Capacity =
400A/Hr
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
Parallel: 4 x 12V
System Voltage = 12V
System Capacity =
400A/Hr
Parallel: 2 x 12V
System Voltage = 12V
System Capacity =
200A/Hr
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
FIGURE 4-J: TYPICAL BATTERY BANK CONFIGURATIONS
Содержание Go Power! Solar Flex Kit GP-FLEX-110
Страница 2: ......