background image

8. CONNECTION OF POWER SUPPLY

TO AIR CONDITIONER (Fig. 8)

WARNING

Be sure power supply is OFF before connecting
power supply leads to the air conditioner.

A.

B.

C.

D.

E.

Route the power supply line, previously
installed to the roof opening, into the
junction box on the ceiling template.

Connect 

 power supply line to the air

conditioner at the terminal block provided
in the junction box.

Connect red to red,

black to black and earth to earth, (P, P,
and   respectively).

Tighten the strain relief onto the power
supply line, to hold it firmly in place.

Carefully push all excess wire back into
the junction box and install covers onto
the boxes with three blunt tipped screws
provided.

Plug the electrical conduit hanging from
the bottom of the air conditioner into the
mating

connector on

the

switch box

located on the ceiling template.

FIG. 
CEILING TEMPLATE   HEATING ASSEMBLY

A.

B.

C.

HEATER INSTALLATION (FIG. 8)

Install the heat package to the ceiling
template

using

the four (4) pointed,

serrated screws provided.

The heater

element will align below the discharge air
opening and the mounting holes will align

with the prepunched holes in the ceiling
template.

Push

the

electrical

onto

the

receptacle at the back of the switch box.
Push excess conduit up into return air
opening.

Insure the insulation covering the conduit
knockout in the air box is still in place as
shown.

FIG. 9

LEAVE
INSULATION

REMOVE

IN PLACE

KNOCKOUT

GRILL   THIS END ONLY

ELECTRICAL.

LUG

 

 VIEW

JUNCTION BOX

Содержание CAL136.003

Страница 1: ...61 003 PRODUCT NO 9916403 01 MODEL CAL136 003 PRODUCT NO 9916503 01 INCLUDES ELECTRIC HEAT KIT WARNING THIS UNIT MUST BE SERVICED BY AN AUTHORIZED SERVICEMAN MODIFICATION OF THE APPLIANCE CAN BE EXTREMELY HAZARDOUS AND COULD LEAD TO SERIOUS INJURY OR DEATH Form No 3100377 013 10 86 ...

Страница 2: ...opening Cut through roof and ceiling 2 Additional Wiring 115V 60 Hz 20 Amo 5PECIAL SHORE LINE COMPARTMENT FUSE PANEL 3 Power must be above 105V and frequency must be 60 Hz at all times 04V WRONG WIRING VOLT LOSSES WRONG FREQUENCY LOW GENERATOR OUTPUT ALTITUDE 2 ...

Страница 3: ...aravan One or more units may be used on the vehicle Consider the van s size roof structure and cooling requirements when determining your needs Normal Min 1 Unit 3SKW Generator Size 2 Units S OKW The Manufacturer gives only general guidelines for Generator reauirements These Generator requirements come from experience consumers have with our equipment in field applications When sizing Generators t...

Страница 4: ...n a level surface Otherwise a sideways pitch up to 20 can be tolerated but a backward pitch can never be accepted WARNING Disconnect all power supplies to the van insure the generator is shut off if present and disconnect the positive battery terminal from the battery before performing any cutting on the van FAILURE TO FOLLOW THIS INSTRUCTION MAY CREATE A SHOCK HAZARD FIG 4 20 WITH A C FACING FORW...

Страница 5: ...ly cut a matching hole through 4 the ceiling of the van FIG 4 B 3 1 Remove Screwr FIG 4 A t 355 X 355mm _ _ _ 7 Opening 75mm I f A I cantu Lin I ot opming 4 AG ICEmm 1 75mmI 1 _______y _______ C 283mm c 283mm e FIG 4 B 3 B Other Cutting new or modifying existing openings This opening should be located between roof structural members 1 Mark the 355 X 355 mm opening on the roof with a marker FIG 4 B...

Страница 6: ... t t a c h m e n t t o the air conditioner e If vent fan was removed the existing wire may be utilized provided it is of proDer size and properlv fused BOX FIG 4 C 3 6 0 0 m m EXCESS WIRE FOR HOOK UP 4 Framing is required around the roof opening to insure adequate support provide a smooth surface for sealing and prevent hot or cold air from being drawn into the opening This framing should be wood ...

Страница 7: ... conditioner will not seal properly if damaged or torn by sliding FIG 5 B 2 FIG 5 B 2 DON T SLIDE OR DRAG 6 UPPER DISCHARGE AIR DUCT INSTALLATION FIG 6 The upper discharge air duct is shipped inside the lower discharge air duct attached to the ceiling template A Remove the upper duct from the ceiling template duct and install it over the blower discharge opening NOTE The edge without the flange go...

Страница 8: ... Caakat FROM BELOW THICKNESS PULL CONDUIT THROUGH IF 26 mm T c 50 mm IF 50 mm T 75 mm D E F DO Take the ceiling template and slide the lower discharge air duct over the outside of the upper discharge air duct Holding the ceiling template in place with one hand install the three 150 mm long mounting bolts up through the ceiling template and into the air conditioner with other hand until mounting bo...

Страница 9: ...ee blunt tipped screws provided Plug the electrical conduit hanging from the bottom of the air conditioner into the mating connector on the switch box located on the ceiling template FIG 8 CEILING TEMPLATE HEATING ASSEMBLY 9 A B C HEATER INSTALLATION FIG 8 Install the heat package to the ceiling template using the four 4 pointed serrated screws provided The heater element will align below the disc...

Страница 10: ... the two knobs provided on the ends of the thermostat and selector switch shafts FIG lOC D E i I 10 F The power supply to the air conditioner may now be turned ON G Your air conditioner is now installed and ready for operation Please read the following instructions before attempting to run the unit 11 OPERATING INSTRUCTIONS Refer to FIG 7 A CONTROLS 1 The Thermostat has a temperature range of 185 ...

Страница 11: ...tion The air conditioner compressor will come 25 C COOLING on and off as cooling is required to maintain your desired temperature level as set at the thermostat NOTE The air conditioner blower runs continuously to circulate the air and maintain an even temperature in the van It does not come on and off with the compressor COOLING I ROOM TEMPERATURE C FAN OPERATION When you wish to circulate the ai...

Страница 12: ...nuously to circulate the air in the van It does not come on and off with the heater E OFF POSITION To shut the air conditioner Off place the selector switch in the OFF position 0 OFF HaEFAFT CO NG FOAFF FIG ll E F When the air conditioners are turned on and the thermostat calls for cooling the fan and compressor start at the same time After shutting the air conditioner down manually by either the ...

Страница 13: ...or switch box FIG 8 E A B C If the van is connected to a motor generator check to be sure the motor generator is running and producing power If the van is connected to a power supply by a land line check to be sure the line is sized properly to run your air conditioner load and that it is plugged into the power supply Check your fuse or circuit breaker E After the above checks call your local serv...

Страница 14: ...ene Rubber Gasket Upper Discharge Air Duct Roof Line Roof Reinforcement Member Power Supply Line Prepared Installation Opening 25 X 380 mm Thick Framing Lower Discharge Air Duct Ceiling Template Junction BOX Unit Mounting Bolts 150 mm Heat Package Mounting Legs Air Box ...

Страница 15: ...ED I JUNCTION BOX i HEAT PACKAGE _ l FACTORY WlAlNG FELD W I R I N G LINESPLICE l 115vrv 60 Hz 10 USE COPPER CONDUCTORS O N L Y Y E L I _ _ I I TERMINAL 4 I 1 IS USED FOR WIRE CONNECTION ONLY AND NOT A N yiONAL PART OF THE START THERMOSrAT 16 ...

Отзывы: