B.
L I F T A N D P L A C E
the unit over the
prepared roof opening.
The blunt end of
the air conditioner goes toward the
of the van. (FIG.
CAUTION:
C.
Center
the rubber gasket as near as
possible over the opening.
This
completes
the outside
work.
Minor
adjustments to the air conditioner position may
be done from inside the van.
DO NOT
slide the air conditioner
across the
roof.
The rubber gasket attached to the bottom
of the air conditioner will not seal properly if
damaged or torn by sliding.
(FIG. 5.B.2)
FIG. 5.B.2
DON’T SLIDE
OR DRAG
6.
UPPER DISCHARGE AIR DUCT
INSTALLATION
(FIG. 6)
The upper discharge air duct is shipped inside
the
lower discharge air duct attached to the
ceiling template.
A.
Remove the upper duct from the ceiling
template duct and install it over the
blower discharge opening.
NOTE: The edge without the flange goes
toward the rear of the van.
B.
Secure the duct in place with two of the
pointed
screws
provided.
There are
prepunched holes in the base pan for ease
of installation.
SIDE WITHOUT
TAB TO REAR
OF APPLIANCE