FIG. 11

Step a
Remove At
Perforation

Step b
Remove At
Perforation

Step c
Use As
Packaged

Upper Discharge
Air Duct

Lower Discharge
Air Duct

Rear Of Air
Conditioner

Upper Discharge
Air Duct

Edge Without
Flange To
Rear Of Unit

FIG. 10

If bolts are left loose there may not be an ad-
equate roof seal or if over tightened, damage
may occur to the air conditioner base or ceil-
ing template. Tighten to torque specifications
listed in this manual.

CAUTION

FIG. 12

Slide Lower Air
Discharge Duct
Over Upper Duct

Roof
Gasket

Hold Ceiling Template With
One Hand And Install 3
Mounting Bolts Finger Tight

Air Conditioner
Return Air
Opening

Disconnect 220 - 240 Volt AC. Failure to follow
these instructions could create a shock hazard
causing death or severe personal injury.

WARNING

!

4. Place the Mechanical Air Distribution Box Kit inside

the Caravan. This box contains mounting hardware
for the air conditioner and will be used inside the
Caravan.

This completes the outside work. Minor adjustments can be
done from the inside of the Caravan if required.

F. Installing The Air Conditioner

1.

Remove air box and mounting hardware from car-
ton.  The upper duct is shipped inside the lower duct
which is part of the ceiling template.

2.

Check for correct alignment and adjust the unit as
necessary (Roof Gasket centers over 362mm x
362mm (± 3.2mm).

3.

Remove upper duct from ceiling template and locate
it over blower discharge. See FIG. 10.

Note: Edge without flange installs toward REAR of opening.

4.

Use two (2) sharp pointed #10 sheet metal screws
to hold duct to base pan.  Screw holes are provided
in bottom of base pan for these screws.

5.

Reach up into return air opening of the air conditioner
and pull the unit's electrical cord down for later
connection.

6.

Measure the ceiling to roof thickness:
a.

If distance is 25mm - 50mm, remove perforated
tabs from both upper and lower ducts. See
FIG. 11.

b.

If distance is 50mm -  75mm, remove perforated
tabs from bottom duct only. See FIG. 11.

c.

If distance is 75mm - 100mm, install ducts as
received. See FIG. 11.

7.

Install ceiling template by sliding lower duct over
upper duct. See FIG. 12.

8.

Hold the ceiling template with one hand and with the
other, install the three 150mm long mounting bolts
through the template and into the base pan.
a.

Finger-tighten the bolts and check alignment.
There should be an equal opening on each side
and the rear flange must be tight against the roof
opening.

b.

EVENLY tighten the three bolts to a torque of
4.5 to 5.5 NM (Newton Meters). This will
compress the roof gasket to approximately
13mm. The bolts are self locking so over
tightening is not necessary.

G. Connection Of Power Supply To Air

Conditioner

Important:

 The electrical installation must be done

by an authorized electrician. In some areas they must
be licensed.

Содержание 3253.331

Страница 1: ...tion of this product can be extremely haz ardous and could result in personal injury or property damage Roof Top Air Conditioner CARAVAN MODEL B3200 TYPE 3253 331 Model B3200 SERVICE OFFICE DometicCorporation ForInformation Contact www dometic com Form No 3310147 000 Danish Dutch English Finnish French German Greek Italian Norwegian Portuguese Spanish Swedish 2005 5 05 Dometic GmbH D 57074 Siegen ...

Страница 2: ...ow for roofs more than 100mm thick C The ability of the air conditioner to maintain the desired inside temperature depends on the heat gain of the Caravan Somepreventativemeasurestakenbytheoccupantsof the Caravan can reduce the heat gain and improve the performance of the air conditioner During extremely highoutdoortemperatures theheatgainoftheCaravan may be reduced by 1 Parking the Caravan in a s...

Страница 3: ...331 NominalCompressor Capacity KW 3 2 1 5 ElectricalRating 220 240 VAC 50Hz 1 Ph Full Load Amps Compressor Motor 5 2 0 8 6 0 0 8 LockedRotorAmps Comp Motor 24 5 0 6 0 5 0 CircuitProtection 10 Amp Time Delay Fuse or Circuit Breaker Input Power KW 1 35 1 64 Minimum Wire Size Up to 8 meters use 1mm2 Copper Generator Size 1 Unit 3 5KW 2 Units 5 0KW Improper installation may damage equipment could enda...

Страница 4: ...rew holes and seams where the roof gasket is located Use a good grade of all weather sealant See FIG 6 9 1 2 39 28 3 4 20 2 1 2 22 FIG 4 24cm 102cm 74cm 51cm 6 4cm 56cm 510mm 283 mm 105 mm 105 mm 283 mm 75mm 75mm Center Line Of Opening Air Box Perimeter Keep This Area Free From Obstructions 105mm 181mm 181mm 362mmx 362mm 3 2mm Opening 543mm Center Line Of Unit 305mm 102mm 102mm Rear Of Unit 362mm ...

Страница 5: ...ct Water standing around the air conditioner may leak into the interior causing damage to the product and the Caravan CAUTION D Wiring Requirements 1 220 240 VAC Supply Line Route a copper 1mm2 with ground 220 240 VAC supply line from the time delay fuse or circuit breaker box to the roof opening a This supply line must be located in the front portion of the 362mm x 362mm 3 2mm opening b ThepowerM...

Страница 6: ...unit as necessary Roof Gasket centers over 362mm x 362mm 3 2mm 3 Removeupperductfromceilingtemplateandlocate it over blower discharge See FIG 10 Note EdgewithoutflangeinstallstowardREARofopening 4 Use two 2 sharp pointed 10 sheet metal screws to hold duct to base pan Screw holes are provided in bottom of base pan for these screws 5 Reachupintoreturnairopeningoftheairconditioner and pull the unit s...

Страница 7: ... kit 4 Carefullypushallexcesswirebackintothejunction box and install cover onto the box with two blunt screwsprovided 5 Plug the electrical conduit from the upper unit into the mating switch box connector See FIG 13 6 Wrap wire tie around plug connector s to prevent removal in field service FIG 13 Route Power Supply Through Romex Connector Plug Conduit Into Switch Box And SecureWithWire TieTo Prev...

Страница 8: ...panelsintheairbox Washthe filters with soap and warm water let dry and then reinstall Note Never run the air conditioner without return air filter in place This may plug the unit evaporator coil with dirt and may substantially affect the performance of the unit 2 Clean air box housing and control panel with a soft cloth dampened with a mild detergent Never use furniture polish or scouring powders ...

Страница 9: ...30 RoofMountAssembly Rear AirConditioner UpperDischarge Duct CeilingTemplate MountingBolts Air Box RoofOpening FIG 17 ...

Страница 10: ...H C L1 4 2 1 MOTOR 2 HEAT ACCESSORY HEAT ACCESSORY BLK BLK BLK ELEMENT LIMIT SWITCH 3 1 WHT LIMIT SWITCH BOX JUNCTION JUNCTION LINE SPLICE LINE SPLICE FIELD WIRING FIELD WIRING FACTORY WIRING TSTAT TSTAT USE COPPER CONDUCTORS ONLY USE COPPER CONDUCTORS ONLY 220 240 VAC 50 HZ 10 220 240 VAC 50 HZ 10 3105580 025 FAN CAP FAN CAP ID ID BLK YEL RED BLU WHT WHT GR YL BLK YEL RED BLU WHT WHT GR YL BRN BR...

Отзывы: