It is the responsibility of the installer of this 

system to ensure structural integrity of the 

Vehicle roof. Never create a low spot on the 

roof where water will collect. Water standing 

around  the  unit  may  leak  into  the  interior 

causing damage to the product and the Vehi-

cle.

D.  Wiring Requirements

 

1.  220 - 240 VAC Supply Wire

 

 

Route a copper, with ground, 220 - 240 VAC sup-

ply wire from the time delay fuse or circuit breaker 

box to the roof opening. The proper size wire can 

be determined from chart on page 3.

Note:

 If vent fan was removed, the existing wire may be 

used provided it is of proper size, location and correctly 

fused.

 

 

a.  This supply wire must be located in the front 

portion of the 362 mm x 362 mm (± 3 mm) 

opening.

 

 

b.  The power MUST be on an appropriately sized 

separate time delay fuse or circuit breaker. The 

proper protection can be determined from chart 

on page 3.

 

 

c.  Make sure that at least 380 mm of supply wire 

extends into the roof opening. This ensures an 

easy connection at the junction box.

 

 

d.  Wiring methods must comply with all national 

and local wiring codes and/or regulations.

 

 

e.  Protect the wire where it passes into the open-

ing with approved method. See paragraph "d" 

above.

Note:

 These power supply connections may be replaced 

with type Y attachments if done by qualified personal.

This unit weighs approximately 45 Kilograms. 

To prevent back injury, use a mechanical hoist 

to place unit on roof.

Do not slide the unit. This may damage the 

roof gasket attached to the bottom and may 

create a leaky installation.

FIG. 6

FRONT

E.  Placing Unit On The Roof

 

1.  Remove the unit from the carton and discard car-

ton.

 

2.  Place the unit on the roof.

 

3.  Lift and place the unit over the prepared opening 

using the gasket on the unit as a guide. See FIG. 

6.

 

4.  Place the  air distribution box kit inside the Vehicle. 

This box contains mounting hardware for the unit 

and will be used inside the Vehicle. 

This completes the outside work. Minor adjustments can 

be done from the inside of the Vehicle if required.

F.  Installing The Unit

 

1.  Remove air distribution box and mounting hardware 

from carton.

 

2.  Check for correct alignment and adjust the unit as 

necessary (Roof gasket centers over the 362 mm 

x 362 mm (± 3 mm) opening.

 

 

FIG. 5 

Do Not Cut 

Roof Structure 

Or Rafters

Good-Rafters 

Supported By 

Cross Beams

Optional Metal 

Frame

Frame Opening So It 

Won't Collapse When 

Bolting Down Unit

Leave Access For 

Power Supply Wiring

381 mm Min. At 

Front Of opening

19 mm Min.

Lift And Place

Do Not Slide

Содержание 3241CX51R

Страница 1: ...er ADB Number ADB Serial Number Date Purchased This manual must be read and understood before installation adjustment service or mainte nance is performed This unit must be installed by a qualified se...

Страница 2: ...AC 50 Hz 10 Amp 3 Powerwhentheunitstartsmustbeabove198VAC and the frequency must be 50 Hz at all times D The ability of the air conditioner to maintain the de sired inside temperature depends on the h...

Страница 3: ...tempting to start this unit installa tion 2 The manufacturer will not be liable for any dam ages or injury incurred due to failure in following these instructions 3 The equipment shall be installed in...

Страница 4: ...ay create a shock hazard causing death or severe personal injury FIG 3 Dimensions Are Nominal Dimensions Are Nominal 70 mm overall depth 635 mm 508 mm Front 76 mm 125 mm 130 mm 76 mm 362 mm x 362 mm 3...

Страница 5: ...to the open ing with approved method See paragraph d above Note These power supply connections may be replaced with type Y attachments if done by qualified personal Thisunitweighsapproximately45Kilogr...

Страница 6: ...arge Opening Remove Liner From Foam Tape Front FIG 7 Screw FIG 10 Start 3 Mounting Bolts By Hand Trim Duct 13 mm To 25 mm Below Ceiling Template Ceiling frame Do not Disturb the position of Mounting B...

Страница 7: ...e Check that the air filters are free to be removed and replaced 13 Position ADB Walls Inside And Against End Of Tem plate Walls Raise Back End Of ADB To Ceiling While holding the box against the ceil...

Страница 8: ...ling mode Auto Button Auto button If the remote control is damaged or lost pressing the Auto button will run the air If the room temperature is above 25 degrees the unit will run in cooling mode 8 FIG...

Страница 9: ...etween 18 C and Press MODE button to select this function and set the 30 C Press MODE button to select ventilation mode then the Timer on mode The machine must be off FIG 15 TURBO FAN CLOCK MODE F SLE...

Страница 10: ...l not start until the air within the air conditioner is 2 Blowing surplus heat function In heating mode the fan will continue to run for appro ximately 60 seconds after the OFF button is pressed 3 Def...

Страница 11: ......

Страница 12: ...12 ROOF MOUNT ASSEMBLY Rear Discharge Duct Ceiling Template With Metal Brackets Mounting Bolts Air Distribution Box ADB Roof Opening Duct Adapter Vents Filter s...

Страница 13: ...to motor generator check to be sure motor generator is running and producing power B If Caravan connected to power supply by a land line check to be sure line is sized properly to run unit load and i...

Отзывы: