background image

W

iring diagram

P 6 / 7

Fig. D-2

Fig. D-3

Kickback switch

rib

Motor housing

Fix Lead wires of Kickback switch
with this Lead wire holder.

Motor housing

Field lead wire

Lead wire of Controller

rib

Fix Lead wires
with these Lead wire holders.

Route Lead wires
through these ribs.

Содержание ES-2135A

Страница 1: ...onal use Continuous Rating W Voltage V Cycle Hz Input Output Max Output W 120 110 15 1 570 1 650 900 1 800 50 60 8 6 1 800 1 000 2 200 50 60 9 2 2 000 1 100 2 200 50 60 8 8 2 000 1 100 2 200 50 60 14 5 900 1 800 50 60 220 230 240 Current A Optional accessories Chain blade 91VG 300 350 400 450mm Guide bar DOUBLE GUARD 91VG 300 350 400 450mm PRO 91 91VG 350 400mm Chain oil TECHNICAL INFORMATION Chai...

Страница 2: ...eth of Push nut 8 will be closed to some extent at this time Remove Filter of felt from Oil supply port and run the machine If Chain oil flows out from Oil supply port there is not trouble with Oil pump The malfunction is caused by clogged Filter in this case Clean up Filter with kerosene and set Filter and Push nut 8 in place Note Removed Push nut 8 can be reused by respreading the closed teeth u...

Страница 3: ... 5 Fig 6 Fig 7 Spike bumper Front handle Screw Screw Fig 4 DISASSEMBLING DISASSEMBLING Do the reverse of the disassembling steps Note When installing Front hand guard fit the protrusion on Front guard in the concave portion on Rod Fig 6 1 Remove Carbon brushes 2 Remove up to Front handle Follow the steps 1 2 3 of 3 2 3 Remove Tank cap and unscrew four screws that fasten Motor housing and Housing w...

Страница 4: ...oken replace with new one while referring to 3 2 2 Turn the kickback brake off by pulling Front hand guard towards Rear handle 3 Remove Brake drum assembly Sprocket by removing E ring 6 Fig 11 Note Flat washer 8 is also removed in this step Be careful not to lose it 4 Turn the kickback brake on by pushing Front hand guard towards Guide bar 5 Remove Front handle guard by unscrewing six Screws Fig 3...

Страница 5: ... when assembling Brake drum assembly to the machine Note 2 Insert the hinge portion of Link plate complete using slotted screwdriver until it stops as illustrated in Fig 14 ASSEMBLING Fig 13 1R005 Compression spring 9 Fig 14 Circuit diagram Fig D 1 Color index of lead wire sheath Black White Orange Yellow Main switch Power supply cord Field Kickback brake switch Noise suppressor Controller Termina...

Страница 6: ... 3 Kickback switch rib Motor housing Fix Lead wires of Kickback switch with this Lead wire holder Motor housing Field lead wire Lead wire of Controller rib Fix Lead wires with these Lead wire holders Route Lead wires through these ribs ...

Страница 7: ...itch Noise suppressor Kickback switch Terminal block Main switch Controller Lead wire holder rib Lead unit orange Put Noise suppressor inside the four ribs if used Connect Lead unit orange as illustrated below to Terminal block Parallel splice to No 2 terminal of Main switch Route Lead wires of Controller as illustrated below rib rib Lead wire holder rib Lead wire holder rib Viewed from rear of Mo...

Отзывы: