![Dohrmann Enterprises DE-1008.5 Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/dohrmann-enterprises/de-1008-5/de-1008-5_owners-manual_2516535008.webp)
8
1008.5-MAN TANK MANIFOLD INSTALLATION
1.
Locate the area you would like to install the
manifold.
2.
Before installation, give some consideration to who
will be opening and closing the valves in the field.
a.
If it is the chopper operator, mount the manifold
either to the side of the cab, on the fender, or on a
baseplate where the operator can reach it.
b.
If someone outside the cab will be changing the
valves, select a location that can easily be reached.
This is typically on the back edge of the fender, or on
a baseplate.
3.
Once you have determined placement, you can secure
the
manifold with the 5/16” bolts and Nyloc nuts enclosed.
If installing onto a baseplate. Make sure to place carriage
bolt heads on the inside of the baseplate, so the nuts are
threaded onto the bolts on the outside of the baseplate.
4.
If mounting elsewhere, verify the mounting holes are
located over an area safe to drill through.
5.
After you have confirmed it is all right to drill in that location, drill holes in the fender and
secure with the included 5/16” bolts and Nyloc nuts.
6.
Determine which port on the assembly will control which tank. Run the hose from the
valve connection to the appropriate tank and connect the hose to the side port of the tank
valve.
See picture on Page 7.
Repeat this step for the other valve and cooler.
•
NOTE:
The direction of the valve will determine
which tank will be drawn from.
7.
The final step is to connect the hose from the
bottom of the manifold valve to the short hose located
on the bottom of the pump unit. The fittings will mate
and snap together.
DRAWING
FROM TANK
ON LEFT