2.  INSTALLATION OF LOWER LINER AND SHAFT

Apply oil to the spherical seats of the housing base and to the 

spherical seats of the lower liner half. The lower liner half is identified 

by its continuous babbitted bore surface; the upper liner half has 

one or two oil ring slot(s) in the center of the babbitted bore.

Set lower liner in housing base so spherical seats of liner are 

aligned with spherical seats of base. Horizontal split of liner MUST 

align with horizontal split of housing for anti-rotation pins in upper 

liner to engage holes in housing cap. Take care that circulating 

oil inlets and thermocouple holes in liner and housing base are 

aligned.

Apply oil to the lower liner bore or to the shaft in liner area and 

CAREFULLY set the shaft in place, taking care not to damage the 

babbitted surface.

CIRC. OIL INLET HOLE

THERMOCOUPLE HOLE

2.1  LABYRINTH SEAL

Attach lower half of each oil seal to housing base. Check possible 

alignment of oil seal by visually noting an equal clearance between 

seal and shaft at each end of the housing. The seals can be adjusted 

somewhat but MUST NOT contact the shaft at any point.

CLEARANCE 
BETWEEN
SHAFT AND 
SEAL

SHAFT

LABYRINTH SEAL

Re-shim pillow block, if necessary. Always shim under the bearing 

pedestal where possible; otherwise, use full length shims under 

base of pillow block.                                              

NOTE: Remove lower half of each labyrinth seal from housing 

after this preliminary alignment to avoid damaging the lip of 

the labyrinth.

SEAL LIP

2.2  OIL DAM and COL (See page 11)

Oil Dam

 - Small rectangular piece of preformed sheet metal used 

to block off most of oil ring slot in upper liner; attaches to lower 

liner.

COL (Collector Oil Leaf)

 - Oil dam with an extended “finger” to 

stabilize oil rings; used for bores 6” and larger.

2.2.1  FOR BORES 2-15/16” through 5-7/16”

‘S’ liner: One oil dam on each side of the shaft (because shaft 

rotation can be either direction).

2.2.2  FOR BORES 6” through 12”

‘S’ liner: One oil dam and one COL on each side of shaft. COLS 

must be diagonally across from one another.

Содержание SLEEVOIL RXT

Страница 1: ...or as may be specified in safety codes should be provided and are neither provided by Dodge nor are the responsibility of Dodge This unit and its associated equipment must be installed adjusted and ma...

Страница 2: ...sing base Check possible alignment of oil seal by visually noting an equal clearance between seal and shaft at each end of the housing The seals can be adjusted somewhat but MUST NOT contact the shaft...

Страница 3: ...Split thrust collars are available for S liners only Remove clamp screws from collars Remove jam screws and back out set screws so they do not protrude into inside diameter of collar MATCH MARKS PART...

Страница 4: ...ghten housing base to pedestal See Table 4 for torque MATCH MARKS CHECK LINERTHRUST FACE COLLAR CLEARANCE Recheck clearance 0 015 to 0 035 in total and parallelism 0 002 in max of thrust collars to li...

Страница 5: ...n Table 6 NOTE Check the construction drawing for seal size and position as three different seal bore sizes can be used on any housing Seals can be reversed depending on shaft configuration and spacin...

Страница 6: ...and properties of specific oils should be referred to the lubricant manufacturer Oil film temperature in liner during operation should not exceed 180 F If in doubt consult equipment manufacturer Use h...

Страница 7: ...4 417066 409082 420053 2 134851 416517 4 417092 409081 420053 2 134851 416517 4 417092 409081 420053 4 134852 134840 134841 416517 8 417210 409081 420066 4 134852 134842 134843 416517 8 417244 409081...

Страница 8: ...se foot mounting holes 12 Vibration detector hole 13 Housing drain hole 14 Circulating oil drain hole or oil level gauge 15 Oil sump heater hole 16 Same as 14 17 Housing shim 18 Housing match mark bas...

Страница 9: ...9 Oil Ring Assembly 22A 22B 22C...

Страница 10: ...10 Labyrinth Seal Assembly 19C 19A 19D 19B...

Страница 11: ...11 Shim Collector Oil Leaf Oil Dam...

Страница 12: ...Dodge Industrial Inc 1061 Holland Road Simpsonville SC 29681 1 864 297 4800 All Rights Reserved Printed in USA MN3067 02 22 3067 0222 DODGE INDUSTRIAL INC AN RBC BEARINGS COMPANY...

Отзывы: