![DKS 6524-081 Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/dks/6524-081/6524-081_installation-and-owners-manual_2512747019.webp)
115
V
EXI
T
LO
OP
RE
VE
RS
E
LO
OP
IN
PO
WE
R/B
AT
T
PW
R
SE
L
RE
V SE
NS
E
JU
MP
ER
ON
SO
LA
R M
OD
E
P3
SE
LF
TES
T
RESE
T
RE
D=
CH
AR
GIN
G
GR
EE
N=
CH
AR
GE
D
KE
Y
SW
ITC
H
NO
NC
3 B
UT
TO
N
CO
NT
RO
L
SW
1
SW
2
OF
F
ON
POW
ER
P4
P2
1
6
TIME
DE
LA
Y
PU
SH
TO
O
PE
RA
TE
tec
hn
ician
us
e onl
y
SECTION 2 - SOLAR POWER TO OPERATOR
Before connecting the solar panel wire to the operator, make sure that the solar panel is blocked from the sunlight.
The solar
panel is “HOT” (discharging power) whenever the sun is shinning on it. It will shock you if you attempt to touch the wires
while it is in the sunlight!
Permanent wiring must be installed to the operator as required by local electrical codes. It is recommended that a licensed
electrical contractor perform this work.
Since building codes vary from city to city, we highly recommend that you check with your local building department prior
to installing any permanent wiring to be sure that all wiring to the operator (both high and low voltage) complies with local
code requirements.
THIS GATE OPERATOR MUST BE PROPERLY GROUNDED!!
2.1 Solar Power Connections
•
Cover solar panel
BEFORE
connecting
wire to power terminal.
•
Route incoming solar power wire
through the solar panel conduit and run
wire to the
operator’s power terminal
.
•
Be sure wiring is installed in
accordance with local codes. Be sure to
color code all wiring.
•
It is recommended that a surge
suppressor (P/N 1878-010) be installed
on the 24V solar power line to help
protect the operator and circuit board
from surges and power fluctuations.
•
Dual gate operators
CANNOT
be used.
DO NOT
power up the operator until
“
Section 2.2”
is complete (see next page).
Damage could occur to the gate operator.
Operator AC Power Terminal
(Not used)
Chassis
Ground
SW 2,
switch 6
MUST
be
ON
when
using
Solar
power.
Battery connection
to operator
MUST
be
24 VDC
.
ON
12
3
4
5
6
78
SW 2
Typical
Grounding
Sources
Ground to metallic
cold water pipe.
Ground
Wire
Ground
Wire
Grounding rod
10 feet in soil.
Operator
ground wire
connection.
IMPORTANT:
Ground wire shown without safety protection for clarity. Make sure ground wire
is protected from being touched or electrical shock could occur!
DIP Switch
Input Power
Setting
Solar Panel Conduit
Support Post
NOT included
Solar
Power
Wire
Pos
Neg
24
Volt
10 Watt
24 VDC
Solar Panel
Connection
Power Terminal
24 VDC
Battery
Connection
#2
Batter
y
12 Volt
18Ahr
Batter
y
Jumper Wire
12 Volt
18Ahr
Batter
y
DANGER of
DAN
GER
of
ELECTRIC SHOCK!!
ELE
CTR
IC S
HO
CK
!!
NEVER
touch the
positiv
e and negative
batter
y leads
together!
#1
Batter
y
DKS Solar Power Kit
batteries fit into battery
tray on back of operator.
Negative
Positive
Polarity
MATTERS!
Connect
ONLY
24 VDC
power. DoorKing Solar Power Kit P/N 2000-070 is recommended. Third party
24 VDC batteries and
solar panel
can be used if desired.
The solar panel will perform
MOST
efficient when installed as close as possible to the operator (Within a couple of feet). Keep in
mind, the efficiency of the solar panel will diminish the farther away the panel is installed from the operator.
•
DO NOT
install a heater kit when using solar power.
DKS Solar
Power Kit
Solar
Panel
CAUTION
DO NOT
connect an
AC input power wire
to the Model 6524-081’s power terminal
when using Solar Power or
DAMAGE
will
occur and
VOID
the warranty!
An EXTERNAL ENTRAPMENT PROTECTION DEVICE MUST be connected or the gate operator WILL NOT function.
6524-066-G-7-16
1
5