2
6500-065-K-7-08
SPECIFICATIONS
1
SECTION 1 - INSTALLATION
10
SECTION 2 - WIRING
14
Gate Construction
Important Safety Instructions
Instructions regarding intended installation:
Important Notices
UL325 Entrapment Protection
Glossary
Swing Gate Requirements
Swing Gate Protection
4
4
4
5
6
7
8
9
10
10
11-12
13
13
14
14
15
15
16
17
18
19
20
1.1 Underground
Conduit
Requirements
1.2 Concrete
Pad
1.3 Type of Installations
1.4 Securing Operator to Pad
1.5 Attach
Gate
Bracket
1.6 Determining
Arm
Lengths
1.7 Installation of Warning Signs
2.1 High Voltage Wire Runs
2.2 High Voltage Terminal Connections
2.3 Control
Wiring
2.4 Loop
Detector
Wiring
2.5 Auxiliary Device Wiring
2.6 Primary / Secondary (Dual) Gate Connection
2.7 Main
Terminal
Description