- 46 -
0DT829 2016-04-01
7. CHECKING AND STARTING
7.1 Check of the movement direction
• Move the panel until it reaches half-way with respect to its stroke.
• Open and close the door by pressing the relative push-buttons, and check the correct movement direction.
• If required, reverse the movement direction by modifying the sequence of the phase and acting on the line cable before
the main switch.
7.2 Cable safety edge adjustments
• Screw until micro switch trips, and then loosen a 1/2 turn. Block the contact
(fig.20).
20