![Ditch Witch SK752 Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/ditch-witch/sk752/sk752_operators-manual_2510014050.webp)
SK752 Operator’s Manual
Transport - 49
Haul
Haul
Load
1.
Start engine.
2.
Adjust throttle to low speed.
3.
Pull lift arm control to raise mount plate (and attachment) clear of trailer, but keep it low.
4.
Move unit to rear of trailer and align with ramps.
5.
Drive forward slowly to move unit onto trailer until tiedown position is reached.
6.
Push lift arm control to lower mount plate (and attachment) to trailer bed.
7.
Engage parking brake.
8.
Ensure that all controls are in neutral position.
9.
Turn ignition switch to STOP.
10. Tie down unit.
Crushing weight. If load falls or moves it could kill or crush
you. Use proper procedures and equipment or stay away.
To help avoid injury:
•
Load and unload trailer on level ground.
•
Incorrect loading can cause trailer swaying.
•
Attach trailer to vehicle before loading or unloading.
•
Only operate unit from operator platform.
•
To help prevent trailer sway, load trailer so that ten to fifteen percent of total vehicle weight
(equipment plus trailer) is on tongue.
•
If loading onto tilt-bed trailer, be prepared for trailer to tilt.
•
Move all controls to neutral position when stopped.
Содержание SK752
Страница 1: ...SK752 Operator s Manual 053 2859 Issue 2 0 Original Instruction...
Страница 11: ...Contents 10 SK752 Operator s Manual...
Страница 21: ...Safety 20 SK752 Operator s Manual Machine Safety Alerts...
Страница 31: ...Controls 30 SK752 Operator s Manual Attachment Plate...
Страница 41: ...Prepare 40 SK752 Operator s Manual Connect Attachment...
Страница 47: ...Drive 46 SK752 Operator s Manual Shut Down...
Страница 55: ...Transport 54 SK752 Operator s Manual Retrieve...
Страница 86: ......
Страница 87: ......
Страница 88: ...SK752 Operator s Manual Service Record 87 Service Record Service Performed Date Hours...
Страница 89: ...Service Record 88 SK752 Operator s Manual Service Performed Date Hours...