JT520 Operator’s Manual
Transport - 65
Lift
CMW
Procedure
Use a crane capable of supporting the equipment's size and weight. See “Specifications” on page 141 or
measure and weigh equipment before lifting.
1.
Attach chains to four lift points (two on each side of drilling unit).
2.
Attach each chain securely to cross members.
3.
Bring chains together to a central pull point.
IMPORTANT:
Length of spreader bars should be equal to width of drilling unit.
Содержание JT520
Страница 1: ...JT520 Issue 1 1 Operator s Manual CMW 053 1219...
Страница 59: ...Prepare 58 JT520 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 60: ...JT520 Operator s Manual Drive 59 CMW Drive Chapter Contents Start Unit 60 Steer Unit 60 Shut Down Unit 61...
Страница 63: ...Drive 62 JT520 Operator s Manual Shut Down Unit CMW...
Страница 71: ...Transport 70 JT520 Operator s Manual Tow CMW...
Страница 113: ...Systems and Equipment 112 JT520 Operator s Manual Drill Pipe CMW...
Страница 117: ...Complete the Job 116 JT520 Operator s Manual Stow Tools CMW...
Страница 132: ...JT520 Operator s Manual Service 131 150 Hour CMW 150 Hour Change Fuel Filter Change filter shown every 150 hours...
Страница 141: ...Service 140 JT520 Operator s Manual As Needed CMW...
Страница 145: ...Specifications 144 JT520 Operator s Manual CMW...
Страница 148: ......
Страница 149: ......
Страница 150: ...JT520 Operator s Manual Service Record 149 CMW Service Record Service Performed Date Hours...
Страница 151: ...CMW Service Record 150 JT520 Operator s Manual Service Performed Date Hours...