PP8 Plus
6
IN50001 Rev. C 04/30/2008
15.
Install all Lock Rods & Linkage components per the drawing on (Page 18)
Figure #5. Also, install Eye bolts (Item # 26) to middle and outside of
Crossbeam on each end. Secure each bolt with Hex Nut (Item # 18).
16.
Mount
Power
Unit (Item # 7) to the Mainside Column w/ attached mounting
bracket using the hardware provided shown in Figure # 1. Once mounted, fill
the Power Unit reservoir tank with hydraulic fluid. Now, install the 90 degree
Hydraulic Fitting (Item #17) to the high pressure port on the Power Unit.
Connect the electrical power to the Power Unit.
17
.
Install the “braded” Hydraulic Hose (Item # 16) Figure # 4 to the Fitting (Item #
37) on the side of the Mainside Runway and the other end to the 90 degree
fitting on the Power Unit as shown in Figure # 4.
18.
Raise unit and set on the locks. Place level on crossbeam.
19.
Tighten Lock Ladder Rod Nut located on the top of each posts. This will raise
the corner of the lift to adjust for leveling. Each post has this adjustment.
Adjust the proper posts to level the lift. Place level on each runway and
crossbeam and check for proper levelness.
NOTE: YOU MAY HAVE TO LOOSEN THE NUT UNDER TOP PLATE TO MAKE
ADJUSTMENTS.
20.
After leveling is complete, tighten the Nut on the Lock Rod underneath the Top
Cap on each post. This will lock the Lock Ladder in position.
21.
Raise lift off all locks until cables are supporting the lift. Adjust the Cable Nylon
Lock Nut (Item # 39) located on the top of each post until lift is level on
crossbeams and runways. This will ensure the lift travels up and down level.
NOTE: YOU MAY NEED TO USE LOCKING PLIERS TO HOLD THE CABLE
FROM TURNING WHEN ADJUSTING THE NYLON NUT. MAKE SURE THAT
THREADS ENGAGE THROUGH NYLON ON EACH NYLON NUT.
After the cables are installed and adjusted, unbolt the sheave covers (Item #
69), Figure # 2. Slide the sheave covers up the cable until you can access the
cable sheave. Install the 8mm cable retention bolts into the threaded holes by
the sheaves at the end of the crossbeams (Item # 101and 102) Figure # 2.
Assure they extend across the width of the sheaves and the bolt heads do not
interfere with the sheaves. Install the 8mm lock nuts to the end of the bolts to
lock them into position. Re-install sheave covers.
22.
Raise lift to a comfortable height to install the 4ea Angle Brackets (Item # 90) to
the underside of the main side Runway (Item # 33). Attach each bracket using
the hardware provided (Items # 74 & 91) as shown in Figure # 3.
23.
Install the Plastic board (Item # 73) Figure # 3 into the Angle Bracket slots on
the underside of the main side Runway.
24.
Install
front
Wheel
Stops (Item # 35) as shown with provided hardware shown in