PP8 Plus
5
IN50001 Rev. C 04/30/2008
7.
Unpack the Crossbeams, Ramps, Safety Latch Linkage Rods and Lock Ladders
from bottom Runway. Remove the Safety Latch covers (Items # 58 & 69) Figure
# 2 from Crossbeams. They will be reinstalled later. Arrange the Crossbeams
so that the Safety Latches / threaded Bolt for the Locking Linkage is facing
outward to ensure that both of the Connecting Rods (B) (Item # 79) are closest
to the power unit side columns.
8.
If you have means for securely lifting the Crossbeam (Item # 6) Figure # 2,
lower it into the tops of the columns. If you don't, then the columns will have to
be placed horizontal on the floor, and the Crossbeam installed in the columns.
Then the entire end structure (two columns and a cross rail) will need to be
stood up as one.
Note: Make sure to install Crossbeams so that the Safety
Latches / threaded Bolt are facing to outside of the lift, once stood up.
The Cables will run on the inside of the Crossbeams.
9.
Unpack the Lock Ladders (Item # 5) Figure # 1 from the package and slide
them into the precut slot on the Rub Blocks (Item # 56) inside each column.
After removing the top nut from the lock ladder you are ready to install the Top
Caps (Items # 3 & 4) Figure # 1 on the columns.
10.
Be aware of the offset hole in Top Caps. Arrange them so that the cable
mounting holes are closest to the runways. Use provided bolts, nuts, washers,
and lock washers to install Top Caps as shown in Figure # 1.
11.
Secure Top Cap and Lock Ladder assemblies together with Washer and Nut
(Items # 32 & 92). Position the Crossbeams at the second lowest locking
position on all columns.
12.
Stand Up and arrange the two end structures (Columns & Crossbeams) so that
the outside of the cross rail to the outside of the cross rail measure's 170.5”.
Compare the measurements from the left and the right until they are diagonally
within 1/2”. The ½” variance will help in mounting the runways.
13.
Lift and position each Runway into place and secure with the provided Hex
Bolts (Item # 22) as shown in Figure # 1. The lift will square itself as you further
assemble it.
Note: Install the Offside Runway (Item # 34) opposite from the Mainside
Runway (Item # 33) and Power unit Column as shown in Figure # 1.
14.
Route and mount the appropriate Cable(s) (Items # 48, 49, 50 & 51) to each
Column Top Cap, while ensuring that the Plastic Cable Pulley (Item # 47) is
between the Cable and the Lock Ladder. This will allow the secondary slack
cable lock to function properly. See Figure # 6 for Cable routing installation.
Note: Make sure all Cables are properly routed around Cable Sheaves.