22
Maintenance instructions
•
DINO 260XTD
4.
PERIODIC SERVICE
The measures, included in the maintenance schedule, that are the responsibility of a skilled
service person, who is thoroughly familiar with the operation and structure of the lift, are
described in this chapter.
4.1. INSTRUCTIONS FOR MONTHLY SERVICE AND INSPECTION
In addition to the measures given in this chapter, you should also carry out the daily
inspections according to the maintenance schedule.
If you observe any flaws, defects or damage in the lift, take the necessary corrective actions.
4.1.1. Lubricate the greasing points
See points 2–9 in the maintenance schedule. The nipples are marked in the lubrication plan.
In the machine, their positions are marked with decals.
Apply grease until the grease, that comes out of the joint, is clean. Wipe off excessive
grease, if necessary.
Lubricant:
Esso Beacon EP2 or equivalent.
Lubrication point
Number in the
lubrication plan
Bearings of the overload protection device
1
Joints of the outriggers and the outrigger cylinders
2 and 3
Joints of the outriggers' foot plates, and the moving parts of the
outrigger limits
4
Bearings of the boom and the articulated arms
5
Bearings of the levelling system of the platform
6
Articulation bearings of the levelling cylinders
7
Articulation bearings of the lifting cylinders
8
Sliding surfaces and rollers of the telescope
9
Lubricate the sliding surfaces of the telescope with silicone.
4.1.2.
Check and adjust the play between the slide pads and the slide surface
Check the play between the slide pads and the slide surface.
If necessary, eliminate the play of the slide pads to make the boom extensions run in the
centre without chafing the edges. The slide pads
must
, however,
not
press the boom.
DANGER
WARNING
CAUTION
NOTICE
The slide pads must always be secured after the adjustment using threadlocker.