OPERATOR
’S MANUAL
with Maintenance Information
Maintenance
42
10 Check the battery acid level. If needed,
replenish with distilled water to 1/8 inch I 3
mm below the bottom of the battery fill
tube. Do not overfill.
11 Install the vent caps and neutralize any
electrolyte that may have spilled.
B-2
Inspect the Electrical Wiring
DINGLI requires that this procedure be
performed every 250 hours or quarterly,
whichever comes first.
Maintaining electrical wiring in good condition
is essential to safe operation and good
machine performance. Failure to find and
replace burnt, chafed, corroded or pinched
wires could result in unsafe operating
conditions and may cause component
damage.
Electrocution / burn hazard.
Contact with electrically charged circuits could
result in death or serious injury. Remove all
rings, watches and other jewelry.
1 Inspect the underside of the chassis for
damaged or missing ground strap(s).
2 Inspect the following areas for burnt,
chafed, corroded and loose wires:
· Ground control panel
· Hydraulic power unit module tray
· Battery pack module tray
· Platform controls
3 Inspect for a liberal coating of dielectric
grease in the following locations:
· Between the ECM and platform controls
·· All wire harness connectors
· Level sensor
4 Turn the key switch to ground control. Pull
out the platform and ground red
Emergency Stop button to the on position.
5 Raise the platform approximately 5.5m
from the ground.
6 Use the Safety Arm. Stop the machine.
Содержание JCPT1523DC
Страница 3: ......
Страница 5: ......
Страница 17: ...OPERATOR S MANUAL with Maintenance Information Decals 12 ...
Страница 18: ...OPERATOR S MANUAL with Maintenance Information Decals 13 ...