OPERATOR
’S MANUAL
with Maintenance Information
Maintenance
36
Pre-delivery Preparation
Report
Fundamentals
It is the responsibility of the dealer to perform
the Pre-delivery Preparation.
The Pre-delivery Preparation is performed
prior to each delivery. The inspection is
designed to discover if anything is apparently
wrong with a machine before it is put into
service.
A damaged or modified machine must never
be used. If damage or any variation from
factory delivered condition is discovered, the
machine must be tagged and removed from
service.
Repairs to the machine may only be made by
a qualified service technician, according to the
manufacturer’s specifications.
Scheduled maintenance inspections shall be
performed by qualified service technicians,
according to the
manufacturer’s specifications
and the requirements listed in this manual.
Instructions
Use the operator’s manual on your machine.
The Pre-delivery Preparation consists of
completing the Pre-operation Inspection, the
Maintenance items and the Function Tests.
Use this form to record the results. Place a
check in the appropriate box after each part is
completed. Follow the instructions in the
operator’s manual.
If any inspection receives an N, remove the
machine from service, repair and re-inspect it.
After repair, place a check in the R box.
Legend
Y = yes, completed
N = no, unable to complete
R = repaired
Comments
Pre-Delivery Preparation
Y
N
R
Pre-operation inspection
completed
Maintenance items
completed
Function tests completed
Model
Serial number
Date
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Содержание JCPT1523DC
Страница 3: ......
Страница 5: ......
Страница 17: ...OPERATOR S MANUAL with Maintenance Information Decals 12 ...
Страница 18: ...OPERATOR S MANUAL with Maintenance Information Decals 13 ...