Sectio
5-12
Tie Dow
1) Plac
2) Rem
3) Sec
5.13 T
on5-Oper
wn Opera
WHEN TR
AND MAC
FOUR TIE
EACH CO
ce the boom
move all loo
cure the cha
Towing O
RUNAWAY
BRAKES.
ALL TIME
FOLLOW
MAXIMUM
MINUTES.
MAXIMUM
ration Inst
ation
RANSPORTI
CHINE SECU
E DOWN EY
ORNER OF T
m in the stow
se items fro
assis and the
F
Operation
Y VEHICLE/
TOWING V
ES. ON-HIGH
INSTRUCTI
M TOWING S
.
M TOWING G
truction
Ding
ING MACHI
URELY TIED
YES ARE PR
THE MACHI
wed position
om the mach
e platform us
Figure 5-4
n
/MACHINE
VEHICLE MU
HWAY TOW
TIONS COUL
SPEED IS 5
GRADE 25%
Op
gli Mach
INE, BOOM
D DOWN TO
ROVIDED IN
INE. (SEE F
.
hine.
sing straps o
Tie Dow
HAZARD. M
UST BE AB
WING IS NOT
LD CAUSE
5 M.P.H. FOR
%.
eration &
inery
MUST BE I
O TRUCK O
N THE FRAM
FIGURE 5-3.
or chains of
wn Diagram
MACHINE H
LE TO CON
T PERMITTE
SERIOUS I
R NO LONG
& Mainte
IN THE STO
OR TRAILER
ME SLAB, O
. AND FIGU
adequate s
m
HAS NO TOW
NTROL MAC
ED. FAILUR
NJURY OR
GER THAN
enance M
OWED MOD
R DECK.
ONE AT
URE 5-4.)
strength.
WING
CHINE AT
RE TO
R DEATH.
30-45
Manual
DE
Содержание BA20ERT
Страница 1: ...Part Nu Rev2 0 mber SM0 Second E 0419111 Edition Dec cember 20 019 Printing g...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 20: ......
Страница 26: ......
Страница 42: ......
Страница 63: ...Sectio 4 21 on4 Mach Indic hine Cont cators trols and Ding Op gli Mach peration inery Mainten nance Ma anual...
Страница 66: ......
Страница 80: ......
Страница 84: ......
Страница 104: ......
Страница 110: ......