Operation & Maintenance Manual
Section3-User Responsibility, Machine
Preparation and Inspection
Dingli Machinery
3-15
9) Place Drive control lever to Forward and carefully drive machine up ascension ramp until right
front wheel is on top of block.
10) With boom over left side of machine, place Drive control lever to Reverse and drive machine
off of block and ramp.
11) Have an assistant check to see that right front wheel remains elevated in position off of
ground.
12) Carefully activate Swing control lever and return boom to stowed position (centered between
drive wheels). When boom reaches center, stowed position, lockout cylinders should release
and allow wheel to rest on ground, it may be necessary activate Drive to release cylinders.
If lockout cylinders do not function properly, have qualified personnel correct the malfunction prior
to any further operation.
Содержание BA20ERT
Страница 1: ...Part Nu Rev2 0 mber SM0 Second E 0419111 Edition Dec cember 20 019 Printing g...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 20: ......
Страница 26: ......
Страница 42: ......
Страница 63: ...Sectio 4 21 on4 Mach Indic hine Cont cators trols and Ding Op gli Mach peration inery Mainten nance Ma anual...
Страница 66: ......
Страница 80: ......
Страница 84: ......
Страница 104: ......
Страница 110: ......