Dimplex EDL200UK-630RF Скачать руководство пользователя страница 3

3

Contents

Contents

1

 

Manual Warnings 

 

  4

 

Safety Information

 

  4

 

Introduction

 

   5

3.1      Control App                                  5

Scope of Delivery

 

  5

5 Pre-Installation

 

  5

5.1 

Handling 

   5

5.2 

Unpacking 

   5

5.3 

Pipework 

   6

5.4 

Taps and Fittings 

 

 

6

5.5 

Risk 

Assessment 

  6

5.6 

Siting 

Considerations 

  6

5.7 

Cold Water Supply   

 

6

5.8 

Building Regulation G3 

          Discharge Requirements 

 

7

5.8.1  Discharge Pipe D2   

 

7

5.8.2 

Worked 

Example 

  7

5.8.3  Termination of Discharge 

           Pipe   

 

 

 

8

5.9 

Product 

Disposal 

  8

Installation 

   8

6.1 

Correctly Site the Cylinder   

8

6.2 

Cold Water Inlet with Inlet 

 Control 

Group 

   8

6.2.1  Install the Inlet Group 

 

8

6.2.2 

Expansion 

Vessel 

  8

6.2.3  Balanced Cold Water Supply  

6.2.4 

Drain 

Valve 

   9

6.3 

Hot Water Outlet 

 

 

6.3.1  Thermostatic Mixing Valve   

9

6.3.2 

Pipe 

Insulation   9

6.4 

Discharge Pipes from Safety 

 Devices    9

6.4.1  Discharge Pipe D1   

 

9

6.4.2  Discharge Pipe D2   

 

9

6.4.3 

Tundish    9

6.5 

Immersion 

Heaters 

  9

6.6 

Air 

Connection   10

6.7 

Ducting 

Design   10

6.7.1 

Worked 

Example 

  10

6.8 

Condensates Draining 

 

10

6.9 

Electrical Connections 

 

11

6.9.1  Accessing Electrical Connections 

11

6.9.1.1  Electricity Provider Contact  

11

6.9.1.2  Connecting the PV Function 

11

Set-Up and Use

 

  12

7.1 

Commissioning   12

7.2 

Using your Hot Water Heat Pump    13

7.3 

Control Box     13

7.4 

Setting the Language   13

7.5 

Setting the Time 

  13

7.6 

Setting the Water Temperature 14

7.7 

Standby Mode    14

7.8 

Boost Function   14

7.9 

Electric Mode 

   14

7.10 Programming 

   15

7.11  Installer Menu   16

7.11.1 

PV 

Mode 

   16

7.11.2  Adjusting the Operating Settings  16

7.11.2.1 

Anti-Bacteria   17

7.11.2.2 

Fan 

Mode 

   17

7.11.2.3 Minimum Temperature 

 

17

7.11.2.4 

Shedding 

   17

7.11.2.5 Maximum Heating Time   

18

7.11.3  Locking the Keypad   

 

18

7.11.4  Resetting Parameters 

 

18

7.11.5  Reading Display 

 

 

19

7.11.6  Counters (Meters)   

 

19

7.12     Control App                                 19

7.12.1  Home Screen                               19

7.12.2  Holiday Mode                               19

7.12.3  Schedule Control                          19

7.12.4  Hygiene Mode                              19

Maintenance 

 

 

          19

8.1 

DHW Cylinder    19

8.2 

Heat Pump         19

8.3 

Air intake & Exhaust 

  20

8.4 

Heat Pump Condensation  

20

8.5 

Electrical Connections 

 

20

8.6      Troubleshooting 

 

 

21

8.7 

Spare 

Parts 

   22

8.8 

Error 

Codes 

   23

Warranty 

   25

9.1 

Warranty Limits 

  25

9.1.1 

General 

Information 

  25

9.1.2  Exclusion from Warranty 

 

25

9.1.2.1 

Use 

    25

9.1.2.2 

Handling 

   25

9.1.2.3 Installation Site 

 

 

25

9.1.2.4 Electrical Connections 

 

25

Содержание EDL200UK-630RF

Страница 1: ...Air Source Heat Pump Water Heater Installation and User Instructions RD01144 2 Important This manual must be left with user after Installation Edel RF...

Страница 2: ...ture reference Installers are required to carry out installation commissioning and ser vicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hot Water I...

Страница 3: ...Electrical Connections 11 6 9 1 1 Electricity Provider Contact 11 6 9 1 2 Connecting the PV Function 11 7 Set Up and Use 12 7 1 Commissioning 12 7 2 Using your Hot Water Heat Pump 13 7 3 Control Box 1...

Страница 4: ...and or user This appliance can be used by children aged 8 years and above and persons with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have been given s...

Страница 5: ...installation If in any doubt please call the appropriate help desk Disregarding the instructions given in this manual in its entirety and any relevant regulations standards and codes of practice will...

Страница 6: ...must be taken when placing the water heater in a garage or outbuilding All exposed pipework must be correctly insulated to avoid frost damage The position and orientation of the water heater should b...

Страница 7: ...2 15 22 9 0 8 28 18 1 0 35 27 1 4 G3 4 22 28 9 1 0 35 18 1 4 42 27 1 7 G1 28 35 9 1 4 42 18 1 7 54 27 2 3 Dimplex recommend an annual maintenance inspection is carried out on the water heater In hard...

Страница 8: ...on vessel membrane before filling the cylinder The pre charge should be greater than or equal to 3 bar 6 2 Cold Water Inlet with Inlet Group The discharge pipe should not be connected to a soil discha...

Страница 9: ...dwellings occupied by people with impaired vision or mobility con sideration should be given to the installation of a suita ble safety device to warn when discharge takes place e g electronically oper...

Страница 10: ...2 5 25 0 External terminal X 1 51 0 51 0 Total System Calculated Pressure Drop 320m3 hr 207 7 Pa 6 7 1 Worked Example The pressure drop information provided is for 160mm semi rigid Ubbink ducting othe...

Страница 11: ...hoose load shedding level 1 the electrical back up is prevented from running If you choose load shedding level 0 both the electrical back up and the heat pump will be prevented from running see Sectio...

Страница 12: ...ischarge and check after closing that valve is not dripping 9 Open expansion relief valve to ensure proper discharge and check after closing that valve is not dripping 10 Check all shower outlets toil...

Страница 13: ...ature remains in the authorised 7 C to 35 C range Outside of this range electrical backup ensures that the domestic hot water is heated The domestic hot water temperature provided by the heat pump is...

Страница 14: ...This function can be programmed to run between 1 and 99 days and is effective as soon as the number of days has been confirmed HOLIDAYS HOLI RETURN 8 Set number of days in standby mode Enter HOLIDAY...

Страница 15: ...exisitng programme MONDAY Set Up and Use Frost PT Frost Protection Mode ECO Heat Pump Only Running CONF Heat Pump Only Running electrical back up if needed 7 10 Programming Heating time for the tank v...

Страница 16: ...al until the screen displays Inst Menu Press the Clock and Menu buttons simultaneously Keep both buttons pressed down until the screen goes blank 7 11 1 PV Mode Setting Description Unit Range Factory...

Страница 17: ...emperature reaches 43o C The heat pump will complete the remaining charge to set temperature 7 11 2 3 Minimum Temperature To C Min No To C Min 43 o c Select Mode Enter It is possible to allow the oper...

Страница 18: ...f locking for accessing the menus In the Installer menu turn the dial to Locking LOCKING LOCKING NO Select No Enter NO Locking is not activated but manual locking is possible by pressing Menu for 3 se...

Страница 19: ...ers The Counters menu shows the number of start ups from the heat pump and the electrical backup In the Installer menu turn the dial to Counters Counter No 1 Number of start ups from the heat pump Cou...

Страница 20: ...heater and the thermostat 10 The immersion heater boss can also be used for access to view the internal components of the cyl inder 11 Re commission unit see chapter 7 1 8 2 Heat Pump Any work on the...

Страница 21: ...ich would reduce the cross sectional area of the conductor 4 Ensured the conductors are tightly and securely connected to the controls or immersion heater 5 Ensured the bared conductors are correctly...

Страница 22: ...higher than the volume in the tank The time period the appliance operates is not too short 12hrs minimum if connected to piping The water temperature is not set too low Condensates are not drain ing T...

Страница 23: ...045 2 Expansion vessel fixing kit R00094 2 DN16 3 4 BSP x 1000 flex pipe R00095 1 1 2 BSP T P valve R00020 1 15 x 22 straight PE tundish R00047 1 Temp sensor 25 C 1243950 C3S PCB Controller 1244096 70...

Страница 24: ...aintained continuously at the standard set temperature if no signal or control is connected to the external control switch OVER PRESS Heat pump pressure too high No water in tank Water is too hot 75 C...

Страница 25: ...being in contact with a part which vibrates Replace expansion valve The compressor is not working and safety temperature is activated Weakness in compressor Replace compressor ERR 02 Incorrect temper...

Страница 26: ...mation 9 1 Warranty Limits Please read the following statements carefully as it affects your warranty Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pa...

Страница 27: ...d Water supply being other than cold domestic water such as rainwater or water from a well or which has particularly hostile or abnormal properties which do not comply with the national rules and curr...

Страница 28: ...28 B C D E A 152 Figure 11 Edel Air Source Water Heater Dimensions for reference only Technical Data and Product Fiche 10 Technical Data and Product Fiche Air Intake Air Discharge...

Страница 29: ...d Product Fiche Cylinder is tested in accordance with EN12897 2006 GDC Group Ltd Edel Air Source Water Heater Product Fiche Reference EDL200UK 630RF EDL270UK 630RF Load Profile Primary M L Energy Rati...

Страница 30: ...2 kW 240V Ventilation Air flow rate 320 to 400 m3 h Air temperature 7 C to 35 C Max air pipe length rigid piping 20m in total intake and rejection Condensates flow rate 0 3 L h Condensates drainage p...

Страница 31: ...31 Power Supply Green Yellow Black Blue Brown Black Blue Blue Black Sensors Black Black Black Black Blue Black Blue Brown Black Brown Communication Bus Display 1 2 Red Fan B1244454 F HPS DV...

Страница 32: ...Red Blue Blue Black Brown Blue Green Yellow Blue Black Blue Blue Red Red Blue HTS WTS HPS High Pressure Switch C25 Compressor Start Capacitor C2 Fan Capacitor C4 Valve F Fan DV Defrost Valve RE Immer...

Страница 33: ...33 Notes...

Страница 34: ...and pressure relief valve and expansion valve been fitted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes A...

Страница 35: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Страница 36: ...plex reserve the right to revise products literature and guarantee terms without prior notice due to a policy of continuous improvement www KIWA co uk www HWA co uk To speak to customer services pleas...

Отзывы: