56
12.5
Remove, Clean and apply grease to the lower Main Shaft Pivot Pin
④
every 50,000 cycles.
•
Loosen the Pivot Pin retaining Set Screw
with an Allen Wrench, slide the Pivot Pin
out of the Mainshaft
and Crankshaft
.
Clean, apply grease, and replace.
WARNING--
the Mainshaft is heavy and could fall
on your foot when the Pivot Pin is removed.
12.6
General Cleanliness
•
The reloading process is inherently "dirty" because of residue from used primers, leftover corn cobb from
tumbling, spilled powder and metal shavings from case trimming on the system. The reloading process of
sizing, seating bullets and primers can generate metal particles. Live primer residue along with leftover Case
Lube are other contaminants that need to be cleaned up regularly. Carefully blow the system out frequently
and remove any debris. Do not spray solvents on the system.
Remove Clean and
Grease
Содержание RL550C
Страница 44: ...44 9 4 Powder Measure Conversion refer to the Exploded View below ...
Страница 60: ...60 15 RL550C EXPLODED VIEWS AND PARTS IDENTIFIER 15 1 Complete Assembly Exploded View 1 ...
Страница 61: ...61 15 2 Frame and Lower Assembly Exploded View 2 ...
Страница 62: ...62 15 3 Toolhead Assembly Exploded View 3 ...
Страница 63: ...63 15 4 Platform and Components Exploded View 4 ...
Страница 64: ...64 15 5 Primer Feed Assembly PN 20263 no Operating Rod Exploded View 5 ...
Страница 65: ...65 15 6 Powder Measure Assembly ...
Страница 66: ...66 15 7 Primer Early Warning System PN20302 Rod and PEWS Kit PN14497 PEWS Alone ...
Страница 75: ...75 18 RL550C TEMPLATE FOR DRILLING MOUNTING HOLES IN BENCH ...