3
Operation
Power up the monitor
Depress the power switch to the on position and wait for the green power
light to display. Wait a couple of seconds for a video display. The monitor
runs the internal power-up self-test, and a system display appears on the
screen.
• If the monitor
is connected
to the host system, a system-specific
message (or prompt) appears on the screen.
• If the monitor
is not connected
to the host system, a self-test
pattern (white, full-on display, all pixels illuminated) appears on the
screen.
NOTE
If neither the green power light, the message display, nor the test
pattern appear on the screen, refer to Table 4–1.
3–1
Содержание VRE01
Страница 15: ...Installation 2 7 ON OFF SWITCH MA X0366 89 POWER LED REAR HORIZONTAL CONTROL VERTICAL CONTROL...
Страница 26: ......