
DECconcentrator 500 Installation
3–11
3.5 Connecting Cables and Connectors
Refer to your Option Card Installation manual for the following information:
1. Identifying the connector and port type
2. Connecting the cable to the appropriate connector and port
3. Observing the LEDs when you are connecting the cables
4. Adding the cable identification numbers to the DECconcentrator 500 Identifi-
cation List in Appendix B
When connecting cables, use the following guidelines:
–
Bridges, workstations, and other single attachment stations (SAS) connect
to the M ports on the Port Card.
–
A concentrator or dual attachment station (DAS) participating in a dual
ring connects to the dual ring through Ports A and B on the Network
Management Card. Cabling goes from Port B of the upstream concentra-
tor or DAS to Port A.
–
In a tree configuration, a concentrator or DAS B port connects to a con-
centrator M port.
To use the out-of-band management, go to Chapter 4.
Содержание DECconcentrator 500
Страница 2: ...Order Number EK DEFCN IN 004 DECconcentrator TM 500 TM Installation...
Страница 52: ...Using Out of Band Management 4 7 2 Enter the Subgroup option number Example 4 3 Selecting the Subgroup...
Страница 58: ...Using Out of Band Management 4 13 Example 4 9 Displaying Show Line Characteristics Cont...
Страница 60: ...Using Out of Band Management 4 15 Example 4 11 Displaying Show Line Counters Cont...
Страница 98: ...Printed in U S A...