Digital Equipment DEC WANcontroller 618 Скачать руководство пользователя страница 5

       Checking the Operational Communication Ports

W618–3–5

NCL> SHOW NODE server DEVICE UNIT unit–name –

_NCL> ALL  STATUS

Device name for
the DEC WAN-
controller 618

where server and unit–name are the names for the DECNIS and DEC
WANcontroller 618, respectively.

Operational communication ports = {W618–3–0,

W618–3–1,  W618–3–2, W618–3–3, W618–3–4, W618–3–6,

W618–3–7}

Port number

For example, if port 5 is faulty, the display reads:

Slot number

 

1.

Start NCL
on the load
host.

2.

Enter the following command:

3.

Find the attribute “operational communication ports”.  This lists the
working ports by device name, where:

4.

The working ports, or lines, can still be used.  You can continue using
the NIC if necessary, but it is best to isolate and replace the faulty com-
ponent as soon as possible.  To do this, follow the procedures indicated
for the ATTENTION state on the problem solving flowchart.

A

NCL>

5

Содержание DEC WANcontroller 618

Страница 1: ...Problem Solving DEC WANcontroller 618 Part Number EK A0546 PS 001 Digital Equipment Corporation 1992 All Rights Reserved 1...

Страница 2: ...ber DEC Network Integration Server Problem Solving outlines NCL commands for checking software problems DEC Network Integration Server Event Messages this is an on line text file The file lists event...

Страница 3: ...The NIC is either waiting to load or is load ing software The NIC has passed its module self test and has successfully loaded the software The NIC is disabled The NIC switch is set down The NIC has f...

Страница 4: ...ension cables If there is more than one cable test all cables in sequence 1 Test the cable nearest the adapter cable 2 If that cable passes the test test the next section of cable 3 Repeat step 2 unti...

Страница 5: ...18 3 6 W618 3 7 Port number For example if port 5 is faulty the display reads Slot number 1 Start NCL on the load host 2 Enter the following command 3 Find the attribute operational communication port...

Страница 6: ...kIntegrationServ er Management 1 Disable the NIC move the NIC switch down 2 Attach the 50 way loopback connector male to the port or cable to be tested 3 Run the module loopback test 4 If the test pas...

Страница 7: ...s an error message is displayed Distribution panel port Synchronous cable When the prompt returns enter the following command server name name of physical line circuit name COUNT LENGTH and DATA speci...

Страница 8: ...Connecting cable Extension cable Action Install a new NIC Refer to the Installation and Service Manual for your DECNIS DO NOT do this unless you are a service person Refer to the panel for installing...

Отзывы: