Turning Point Gates
Gate Installation Instructions
- 6 -
Figure E1
Figure E2
Plug into 110-
volt receptacle
Run Wires to
Circuit Board
Back
Front
Figure E1 (a)
Closed Open
B. Control Box Installation.
1.
The control box contains the circuit board,
wireless receiver with it’s antenna, test
switch, and alarm. It also houses the
battery. The Circuit board (figure E1) has
dipswitches, fuses, and sensitivity
adjustments. Do not remove the circuit
board or touch the backside of it. Doing so
will void the warrantee.
2.
Turning Point gates are a low voltage (12-
volt) system. This minimizes the risk of
electric shock. All wires routed into the
control panel must pass through the strain
relief fittings at the bottom of the control
box.
3.
Mount the control box in the desired
location.
4.
Check the dipswitches and make sure all
switches on the main panel board are
closed. (See figure E1 (a))
5.
Route the wires to the control box from the
gate(s) and attach the wires from one gate
to the terminals marked “GATE 1”.
Polarity of the wires is not critical. If there
is a second gate attach those wires to the
terminal marked “GATE 2”. Again polarity
is not critical (see section C. Control Box
Wiring Functions (o) and (p).
6.
Attach the charging source(s) to the
“SOLAR/AC” terminal. A 12-volt AC/AC
transformer (supplied with control box [see
figure E2) may be plugged into any 110-
volt receptacle. Wires (not supplied) are to
be run from the transformer to the terminals
on the circuit board
.
DO NOT
CONNECT 110-VOLT AC DIRECTLY
INTO THE CONTROL BOX
.
Solar
Panels and/or AC/AC transformers may be
attached to this terminal. These terminals
are not polarity sensitive.
7.
Attach the 12-Volt battery.
This is polarity
sensitive
.
DO NOT reverse the polarity
when attaching the battery
.
To hook up
the battery with the wrong polarity will
cause the panel to fail and void the
warrantee!
8.
Press the button on the remote transmitter
to activate the gate(s). (If the remote does
not function see section E “Trouble
Shooting”).
a.
If the gates do not move, allow 10
seconds and press the button
again.
b.
On a double drive system, if one
gate moves and the other gate does
not, allow the one gate to go till it
stops. Reverse the wires on the
one gate and press the button
again. This time one gate only will
move and synchronize with the
other gate. Wait 10 seconds and
Potentiometer
(Sensitivity
Adjustment)
Fuses
Dipswitches
Gate Installation Instructions
Содержание Turning Point
Страница 1: ...TM TM TM TM TM TM Installation and Operators Manual...
Страница 2: ......
Страница 19: ......
Страница 20: ...99705 07 11 11...