EN
SERVICE
DiBO 34
Service
GENERAL
all maintenance activities must happen at an disconnected machine and
hoses without pressure. allow to cool down the cleaner before performing
maintenance activities! Checking the electric components can happen
exclusively by an expert. Exclusively accessories and replacement components
which have been approved by the manufacturer can be used. Directly after
the activities all securities- and protection parts must be assembled, before
the machine is put in functioning. allow the cleaner to cool down before you
perform maintenance activities! “a golden rule” that contributes to a perfectly
working machine with few problems, is well the following:
A daily control and cleaning of the machine frequently do wonders!
To be able to guarantee a perfectly working system, one has first necessary a
reliable and technical well considered machine, which is then faced secondly
at regular times with a thorough maintenance. Therefore the experience and
the “know-how” of DiBo a technical good working machine is insured and large
maintenance turns can be carried out by experienced DiBo technicians by
means of appointment or maintenance contract, we can suppose in advance
that it is satisfied to these two points.
MAINTENANCE DIAGRAM
1
General
Check the machine daily by means of the maintenance diagram. you find the
maintenance diagram on the following pages. Check transmission belts on
good tension, possible defects. If not, then consult a proper service technician.
PAY ATTENTION: take care that the transmission belts are not
in movement and observe the applying safety standards! Before
starting any maintenance works: always secure the trailer with
wheel blocks, uncouple the battery, make sure that the diesel
engine is switched off & has been cooled sufficiently!