MODEL BMG-780 GRINDER
SECTION 7
MAINTENANCE
52
OPERATING MANUAL
MARCH 2009
Grinding & Polishing
Fig. 7.4
Disassembly:
•
Take off the retaining ring (1).
•
Remove the bearing housing (4)
•
Take off the retaining ring (3)
•
Remove the bearing (2)
•
Unscrew the bolts (5) of the taper bush (6)
•
Remove the taper bush (6), the key (8) and the pulley (7).
•
Take off the retaining rings (9)
•
Remove the bearing housing (12)
•
Take off the retaining ring (11) and the bearing (12)
Assembly:
Make sure that the bearing (9) and bearing housing (6) are clean and rub
the bearing (9) with a few drops of Loctite 609.
•
Assemble the parts in the reverse order that they have been
disassembled.
7.7 PULLEY
Prior to any repair work being carried out on the machine or its
drives, secure the machine against unintentional activation. See
Section 2.6.
Содержание BMG-780 ULTRAPRO
Страница 32: ......
Страница 71: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 70 Grinding Polishing OPERATING MANUAL MARCH 2009 Upper Part ...
Страница 73: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 72 Grinding Polishing OPERATING MANUAL MARCH 2009 Lower Part ...
Страница 81: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 80 Grinding Polishing OPERATING MANUAL MARCH 2009 Center Pulley ...
Страница 83: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 82 Grinding Polishing OPERATING MANUAL MARCH 2009 Contra pulley ...
Страница 85: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 84 Grinding Polishing OPERATING MANUAL MARCH 2009 Driving Pulley ...