MODEL BMG-780 GRINDER
SECTION 7
MAINTENANCE
47
OPERATING MANUAL
MARCH 2009
Grinding & Polishing
Operating hours/time period
Inspection points, and
maintenance instructions
12 hours after repairing
Check all accessible screw connections for
tightness.
Daily and prior to starting work
Verify all safety devices are working
correctly.
Check the power supply cable for damage.
Check the dust collector hose for damage.
Check the optional water tank and system
for damage, if applicable.
Check grinding disk coupling and remove
any foreign material and debris.
Check the grinding disc and the coupling
for wear.
Check the countersunk head screw of the
grinding disc for tightness.
Check the tension of the V-belt, adjust as is
required.
Check the brush dust seal.
Quarterly
Clean the machine with a damp cloth.
Annually
Full overhaul and cleaning of the complete
machine.
Replacement of the pulley parts. (about
200 hours).
7.2 MAINTENANCE AND INSPECTION LIST
Содержание BMG-780 ULTRAPRO
Страница 32: ......
Страница 71: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 70 Grinding Polishing OPERATING MANUAL MARCH 2009 Upper Part ...
Страница 73: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 72 Grinding Polishing OPERATING MANUAL MARCH 2009 Lower Part ...
Страница 81: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 80 Grinding Polishing OPERATING MANUAL MARCH 2009 Center Pulley ...
Страница 83: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 82 Grinding Polishing OPERATING MANUAL MARCH 2009 Contra pulley ...
Страница 85: ...MODEL BMG 780 GRINDER SECTION 10 SPARE PARTS 84 Grinding Polishing OPERATING MANUAL MARCH 2009 Driving Pulley ...