Safety Requirements 

 
These are general guidelines, all personnel involved should adhere to the safety requirements of the particular location 
at which they are performing their operations.  
 
Dhatec recommends wearing of suitable PPE while handling their products. This includes gloves, safety shoes, safety 
glasses, safety helmet and suitable work clothing.  

 

The working areas should be kept tidy at all times in order to minimize the risk of trips and slips. 

 

All personnel involved should use suitable manual handling techniques and follow industry recommended guidelines for 
lifting and movi

ng, such as those described in “Ergonomic Guidelines for Manual Material Handling” published by the 

National Institute for Occupational Safety and Health (Publication 2007-131), or those otherwise prescribed by the client.   

 
 

  

 

 

  

 

 

  

  

 

 

 
 
 
 

Introduction 

 
The V-Sup is a system designed to support pipes during construction activities. Supporting these pipes is not without 
risks. If the pipes are not handled and supported carefully, serious damages or injuries can occur. 
 
The purpose of this installation manual is to make the users of the V-Sup aware of the risks and dangers resulting from 
the installation, use and maintenance of the system. This manual provides basic safety guidelines to cope with the risks 
and hazards and to guarantee a safe way of supporting pipes. In spite of these basis guidelines, one should always 
respect the local safety regulations. 
 
Everybody who will use the V-Sup system should be familiar with the essence of this manual. Therefore, it is obligatory 
to carefully read this manual thoroughly,  before installing  and  using the  V-Sup system. The installation of the  V-Sup 
may only be realized by trained employees, who are completely known with the guidelines and procedures specified in 
this manual. 
 
Always contact Dhatec in case of doubts or uncertainties during installation, operation and maintenance of the V-Sup. 

 

 

Содержание V-Sup

Страница 1: ...jn Bayens 03 12 02 2018 Released Bas Coenen Martijn Bayens 04 02 04 2019 Released Bas Coenen Martijn Bayens Dhatec B V The following document shall be considered as copyright and the design right rese...

Страница 2: ...ur knowledge correct at the date of publication However Dhatec B V cannot be held responsible for consequences that follow from the claims that were made in this document Do not carry out any repairs...

Страница 3: ...support pipes during construction activities Supporting these pipes is not without risks If the pipes are not handled and supported carefully serious damages or injuries can occur The purpose of this...

Страница 4: ...e 90 C 194 F User actions Before installing a V Sup stack subject the parts to an extensive visual inspection and discard the parts that show product failures chapter A 2 The V Sup beams must be free...

Страница 5: ...be found in the following paragraphs of this chapter A General instructions for V Sup A 1 Equipment A 2 Product check B Installation of the V Sup B 1 Preparation of construction location B 2 Installat...

Страница 6: ...ing This means two beams will be placed directly on the ground after which a pipe can be placed on top of them The V Sup is capable of supporting pipes up to 2032 mm 80 A pipe has to be supported by a...

Страница 7: ...safe way check all products before using them Do that by looking at the next points The beams should always be able to lock into each other without any problems The beams should not show signs of exte...

Страница 8: ...cles such as wood stones gravel or any other obstacles To ensure a safety envelop large enough the use of the V sup is recommended within a temperature window of 30 C up to 45 C 22 F to 113 F Step B 2...

Страница 9: ...he V Sup stack are free of ice snow oil mud algae or any other substances that have a negative influence on the friction Make sure the V beam is free of ice snow oil mud algae or any other substances...

Страница 10: ...ure the surface on which the V Sup will be installed is free of obstacles such as wood stones gravel or any other obstacles Make sure the minimum and maximum operating temperatures of respectively 30...

Страница 11: ...ure the V Sup stacks are loaded carefully The V Sup can be loaded with all different lifting equipment hooks reach stacker vacuum lifter slings etc Make sure that during the lifting and loading proced...

Страница 12: ...12 Guidelines to check if V Sup is used properly Figure 15 Contamination in recesses Figure 13 Unevenness in terrain Figure 12 Correct V Sup stack Figure 14 Beams on their sides...

Страница 13: ...13 Figure 16 V Beam in outer recesses Figure 16 Correct V Sup Stack Figure 17 Beams placed next to recesses Figure 18 Stackable Beam left out of the stack...

Отзывы: