Dhatec V-Sup Скачать руководство пользователя страница 2

 

Change Record 
 

Rev. 

Description of Revision 

00 

First Issue 

01 

Amount of stackable beams per stack (page 7) 

02 

Adaptation of minimum usage temperature  

03 

Adaptation of maximum usage temperature  

 

 

 

 

 
 
 
General Information 
 

Equipment 

V-Sup 

Supplier Name 

Dhatec B.V. 

Telephone No. 

+31 497 542 527 

Fax No. 

+31 497 555 399 

Contact e-mail address 

[email protected]  

 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Disclaimer of liability:

 Every effort has been made to ensure that the information in this document is accurate and 

correct to the best of our knowledge, correct at the date of publication. However, Dhatec B.V. cannot be held 
responsible for consequences that follow from the claims that were made in this document. 

Do not carry out any repairs or modifications on the equipment without consulting Dhatec B.V., doing so will invalidate 
the guarantee. The guarantee is also invalidated if accidents and damage of any form are caused as a result of improper 
use and/or not obeying the warnings in general as explained in this user guide. Dhatec B.V. accepts no responsibility 
for any personal accidents as a consequence of not following the safety instructions and warnings. This is also the case 
for consequential loss in any form.

  

 

Содержание V-Sup

Страница 1: ...jn Bayens 03 12 02 2018 Released Bas Coenen Martijn Bayens 04 02 04 2019 Released Bas Coenen Martijn Bayens Dhatec B V The following document shall be considered as copyright and the design right rese...

Страница 2: ...ur knowledge correct at the date of publication However Dhatec B V cannot be held responsible for consequences that follow from the claims that were made in this document Do not carry out any repairs...

Страница 3: ...support pipes during construction activities Supporting these pipes is not without risks If the pipes are not handled and supported carefully serious damages or injuries can occur The purpose of this...

Страница 4: ...e 90 C 194 F User actions Before installing a V Sup stack subject the parts to an extensive visual inspection and discard the parts that show product failures chapter A 2 The V Sup beams must be free...

Страница 5: ...be found in the following paragraphs of this chapter A General instructions for V Sup A 1 Equipment A 2 Product check B Installation of the V Sup B 1 Preparation of construction location B 2 Installat...

Страница 6: ...ing This means two beams will be placed directly on the ground after which a pipe can be placed on top of them The V Sup is capable of supporting pipes up to 2032 mm 80 A pipe has to be supported by a...

Страница 7: ...safe way check all products before using them Do that by looking at the next points The beams should always be able to lock into each other without any problems The beams should not show signs of exte...

Страница 8: ...cles such as wood stones gravel or any other obstacles To ensure a safety envelop large enough the use of the V sup is recommended within a temperature window of 30 C up to 45 C 22 F to 113 F Step B 2...

Страница 9: ...he V Sup stack are free of ice snow oil mud algae or any other substances that have a negative influence on the friction Make sure the V beam is free of ice snow oil mud algae or any other substances...

Страница 10: ...ure the surface on which the V Sup will be installed is free of obstacles such as wood stones gravel or any other obstacles Make sure the minimum and maximum operating temperatures of respectively 30...

Страница 11: ...ure the V Sup stacks are loaded carefully The V Sup can be loaded with all different lifting equipment hooks reach stacker vacuum lifter slings etc Make sure that during the lifting and loading proced...

Страница 12: ...12 Guidelines to check if V Sup is used properly Figure 15 Contamination in recesses Figure 13 Unevenness in terrain Figure 12 Correct V Sup stack Figure 14 Beams on their sides...

Страница 13: ...13 Figure 16 V Beam in outer recesses Figure 16 Correct V Sup Stack Figure 17 Beams placed next to recesses Figure 18 Stackable Beam left out of the stack...

Отзывы: