2
24
Hardware Installation
2.6.15 J23 (LEDs and Switches)
SB-LED: ATX Standby 5VSB Power LED
This LED will light when the 5VSB power is active.
HD-LED: Primary/Secondary IDE LED
This LED will light when the hard drive is being accessed.
G-LED: Green LED
This LED will light when the system is in the Suspend mode.
SP-SW: ATX Power Switch
Depending on the setting in the Soft-Off By PWR-BTTN of the
Power Management Setup, this switch is a dual function power
button that will allow your system to enter the Soft-Off or Suspend
mode.
G-SW: Green Switch
This switch will allow your system to enter the Suspend mode. To
wake up the system, Reload Global Timer Events in the Power
Management Setup (Chapter 3) must be enabled so that access to
the specified IRQ will cause the system to wake up completely from
the Suspend mode.
RESET: Reset Switch
This switch allows you to reboot without having to power off the
system thus prolonging the life of the power supply or system.