background image

H
H

HIGH VOLTAGE TEST MUST BE DONE 

VDE 0701  BVG A2
PROTECTION CLASS 2 (double isolation)                            
3sec 2500V
PROTECTION CLASS 1 (earth wire):                
3sec 1000V

Earth wire examination                                

up to 5 m <=0.3 Ohm                                 

per further 5m + 0.1Ohm

Before repair

Содержание D25123K

Страница 1: ...H H D25032 to D25263K Combination Hammers ...

Страница 2: ...ffering 22mm 2 mode D25123K D25223K D25012K D25013K D25124K 22mm 3 mode 26mm 3 mode 26mm 3 mode QCC 26mm 3 mode 22mm 2 mode D25133K D25263K D25032K D25033K D25134K 22mm 3 mode 26mm 3 mode 26mm 3 mode QCC 28mm 3 mode D25144K 28mm 3 mode QCC GAP ...

Страница 3: ...H H OPP Short Stack Motor MPP Medium Stack Motor HPP Long Stack Motor Modular Conception ...

Страница 4: ...H H 22 mm OPP Hammer Durable 710 Watt short stack motor 20 mm Ram 15 5 mm stroke wobble bearing Jam pot housing ...

Страница 5: ...H H 26 mm MPP Hammer durable 800 Watt medium stack motor 20 mm ram 18 9 mm strocke wobble bearing jam pot housing ...

Страница 6: ...H H 28 mm HPP Hammer durable 900 Watt long stack motor 22 mm ram 22 0 mm strocke wobble bearing jam pot housing non pumping beat pice ...

Страница 7: ...H H New Range Visual Differentiation 26mm 22mm 28mm Plastic rear handle Rubber grip rear handle Rubber grip side handle Rubber grip rear handle Rubber grip side handle Silver panel Side handle light ...

Страница 8: ...H H Before repair and service Follow the safety instructions ...

Страница 9: ... accessories drill bits chisels cutters etc Never repair a product whilst it is plugged into a power supply or a battery is connected Remove accessories drill bits chisels cutters etc Release tension on parts before attempting to remove for example arm springs Where fitted ensure side handles function correctly After repair Carry out Earth continuity Earth leakage and Insulation test flash test wh...

Страница 10: ...HORARIO DRAAI LINKSOM TURN CLOCKWISE DREHEN IN UHRZEIGERSINN GIRARE IN SENSO ORARIO TOURNEZ DANS LE SENS DES AIGUILLES D UNE MONTRE GIRO DERECHA GIRAR NO SENTIDO HORARIO DRAAI RECHTSOM MOVE IN THIS DIRECTION IN RICHTUNG BEWEGEN MUOVI IN DIREZIONE BOUGEZ DANS CETTE DIRECTION DIRECION DE LA FLECHA AVANÇAR NESSA DIREÇAO BEWEEG IN DE RICHTING VAN DE PIJL CORRECT RICHTIG CORRETTO CORRECT CORRECTO CORRE...

Страница 11: ...DE FUNCIONAMENTO FUNCTIETEST CLEAN THE TOOL GERÄT REINIGEN PULIRE L UTENSILE NETTOYEZ L OUTIL LIMPIEZA DE HERRAMIENTAS LIMPE A FERRAMENTA REINIG HET TOESTEL SEND THE TOOL TO THE CUSTOMER GERÄT ZUM KUNDEN SENDEN SPEDIRE L UTENSILE AL CLIENTE EXPEDIEZ L OUTIL AU CLIENT ENVIAR LA HERRAMIENTA AL CLIENTE ENVIAR A FERRAMENTA AO CLIENTE VERZEND HET TOESTEL NAAR DE KLANT ...

Страница 12: ...H H High voltage Test has to be carried out High Voltage Test ...

Страница 13: ... sure the unit is in a electrical good condition like Power cable must be in good condition in order to avoid electrical injuries High voltage test must be carried out in order to be sure the whole unit is in a electrical safe condition ...

Страница 14: ...H VOLTAGE TEST MUST BE DONE VDE 0701 BVG A2 PROTECTION CLASS 2 double isolation 3sec 2500V PROTECTION CLASS 1 earth wire 3sec 1000V Earth wire examination up to 5 m 0 3 Ohm per further 5m 0 1Ohm Before repair ...

Страница 15: ...H H Before repair and service Check all functions of the unit Tool Holder Mode Selector Switch power cable is not plugged in Switch lock Front handle Hammer mechanism Spindle lock system ...

Страница 16: ...H H Before repair Function Test ...

Страница 17: ...ysis is a step by step approach that leads to the identification of a fault s first or root cause Every system equipment or component failure happens for a reason There are specific succession of events that lead to a failure A root cause analysis investigation follows the cause and effect path from the final failure back to the root cause ...

Страница 18: ...H H Durability of pneumatic hammers heavily depends upon CLEANLIESS during service ...

Страница 19: ...H H 2015 33 59 ...

Страница 20: ...H H ...

Страница 21: ...H H 1 2 3 4 ...

Страница 22: ...H H 3x16 Ph1 ...

Страница 23: ...H H ...

Страница 24: ...H H 4x18 Tx20 4x39 4 Tx20 4x45 Tx20 ...

Страница 25: ...H H ...

Страница 26: ...H H 4x18 Tx20 ...

Страница 27: ...H H ...

Страница 28: ...H H ...

Страница 29: ...H H Allen Key 1 5 ...

Страница 30: ...H H HPP D25263 2015 33 59 ...

Страница 31: ...H H 4x18 Tx20 4x42 Tx20 ...

Страница 32: ...H H ...

Страница 33: ...H H 1 5mm ...

Страница 34: ...H H ...

Страница 35: ...H H 4x18 Tx20 ...

Страница 36: ...H H 4x45 Tx20 4x42 Tx20 4x18 Tx20 ...

Страница 37: ...H H ...

Страница 38: ...H H ...

Страница 39: ...H H ...

Страница 40: ...H H ...

Страница 41: ...H H 3 8 Tx20 ...

Страница 42: ...H H ...

Страница 43: ...H H ...

Страница 44: ...H H ...

Страница 45: ...H H ...

Страница 46: ...H H ...

Страница 47: ...H H 4x39 65 Tx20 ...

Страница 48: ...H H 1 2 3 4 ...

Страница 49: ...H H ...

Страница 50: ...H H ...

Страница 51: ...H H QCC Quick Change Chuck ...

Страница 52: ...H H ...

Страница 53: ...H H ...

Страница 54: ...H H ...

Страница 55: ...H H ...

Страница 56: ...H H ...

Страница 57: ...H H ...

Страница 58: ...H H ...

Страница 59: ...H H 1 2 3 4 ...

Страница 60: ...H H ...

Страница 61: ...H H ...

Страница 62: ...H H ...

Страница 63: ...H H ...

Страница 64: ...H H 4x19 4 Tx20 ...

Страница 65: ...H H ...

Страница 66: ...H H ...

Страница 67: ...H H 1 2 3 4 ...

Страница 68: ...H H 4x9 2 Tx20 ...

Страница 69: ...H H ...

Страница 70: ...H H ...

Страница 71: ...H H 1 2 3 4 ...

Страница 72: ...H H ...

Страница 73: ...H H ...

Страница 74: ...H H ...

Страница 75: ...H H ...

Страница 76: ...H H NQCC Non Quick Change Chuck ...

Страница 77: ...H H 1 2 3 4 ...

Страница 78: ...H H ...

Страница 79: ...H H ...

Страница 80: ...H H Remember the next check will be made by your customer ...

Отзывы: