background image

8

Air Connections

1.  The Blazer 9000 has air safety releases, which require that an air system be installed. 

2.  The air valve can be mounted on the optional power unit stand referenced above. 

3.  Maximum air pressure on the system is 50

-60 

PSI.  Use regulator to control pressure and water 

filter to keep system dry. 

4.  Reference page #11 for the air schematic and required connections. 

Surface Mounting

1.  Lifts that cannot be recessed must utilize the optional ramps that will be anchored to the concrete 

floor.  Each ramp is anchored utilizing two 5/8” anchor bolts.  The ramp is butted against the lift 

base, which provides the means for the vehicle to roll on the lift. 

II.  Owner/Employer Responsibilities

The owner/employer shall: 

1.  Ensure that lift operators are instructed in the safe use and operation of the lift using the 

manufacturer instructions and safety tips. 

Display a copy of the manual in a location convenient to the lift so the operators can refer to it 

as required. 

2.  Establish procedures to maintain, inspect and care for the lift in accordance with the 

manufacturers recommended procedures to ensure its continued safe operation. 

3.  Provide necessary lock out/tagouts of energy sources per ANSI Z244.1-1982 before beginning any 

lift repairs. 

4.  Not modify the lift in any manner without prior written consent of the manufacturer. 

5.  Ensure that there is adequate drainage around the lift so water will not accumulate on the base of 

the lift. 

6.  In the unlikely event that one side of the lift will not lower all the way to the floor, slowly crack the 

hydraulic line (at the power unit) on the line coming from that side of the lift and allow oil to 

escape until it reaches he floor.   

Содержание BLAZER 9000

Страница 1: ...ft Operator s Manual Note Instructions must be read thoroughly before installing operating or maintaining the lift BLAZER 9000 LUBE LIFT OPERATOR AND PARTS MANUAL Devon Industries 800 468 1970 Fax 405...

Страница 2: ...the car over the lift Install the rubber pads or the lifting arms as required after the vehicle is centered over the lift and the vehicle lifting points have been identified 2 The lifting arms have ex...

Страница 3: ...zer 9000 may be mounted on several types of surfaces including regular concrete pre cast concrete and other configurations that may utilize metal beams etc 3 There should be adequate space on all side...

Страница 4: ...4 Layout Dimensions...

Страница 5: ...5 Layout Dimensions...

Страница 6: ...6...

Страница 7: ...pters for the motor mount The unit owner or manager should approve the location 2 If used the power unit stand will require four 3 8 anchor bolts which are provided with the stand 3 230 Volt Electrica...

Страница 8: ...perators are instructed in the safe use and operation of the lift using the manufacturer instructions and safety tips Display a copy of the manual in a location convenient to the lift so the operators...

Страница 9: ...HOHYDWLRQV RQ WKH LQLWLDO VWDUW XS WKH ZLOO HYHQ RXW DV WKLV SURFHVV XQIROGV Depress and hold the air lock release button this should raise the locks out of the latch bar on both left right side base...

Страница 10: ...lightly oil movement parts lift pad stacking extensions 2 Re Torque the anchor bolts if necessary See CAUTION Below 3 Check all connectors bolts pins to insure proper mounting alignment 4 Make a visua...

Страница 11: ...be just under the fill cap port when the lift is down 3 Motor runs but lift picks up partial load only A Faulty relief valve Replace B Oil is coming out of breather on cylinder C Seals damaged 4 Oil b...

Страница 12: ...UHSDLU LQVSHFWLRQ LI DSSOLFDEOH DQG KRXU IRU D UHDVRQDEOH WLPH IUDPH IRU UHSDLU 1R PLOHDJH UHLPEXUVHPHQW ZLOO EH SDLG IRU LQLWLDO UHSDLU LQVSHFWLRQ 0LOHDJH ZLOO EH UHLPEXUVHG IRU UHSDLU WULSV RYHU PL...

Страница 13: ...BBBBBBBBBBBBBBBBBB 3K VLFDO GGUHVV RI LIW BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB LW BBBBBBBBBBBBBBBBBBBBBBBBBB 6WDWH BBBBBBBBBBBBB LS BBBBBBBBBBB 7HOHSKRQH 1R BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB...

Страница 14: ...13 921 8 17 5 48 30 17 PARTS MANUAL BLAZER 9000...

Страница 15: ...14...

Страница 16: ...RM STR 4 13 92452 INNER LIFT ARM STR 4 14 91555 LIFT PAD ASSEMBLY 4 91559 LIFT PAD BOLT ON 4 91556 LIFT PAD STRUCTURE 4 100179 HEX SCREW 3 8 16NC X 3 4 8 100082 FLATWASHER 3 8 SAE 8 92492 ARM RETAINER...

Страница 17: ...16...

Страница 18: ...1 95170 Power Unit 1 2 OERZ 137 2 1 924 HYD Hose Long RH or LH 3 1 924 HYD Hose Long RH or LH 1 92413RH HYD Cylinder RH 92413RH PART NAME PART SYS QTY HYDRAULIC SCHEMATIC OLQGHU 1...

Страница 19: ......

Отзывы: