
37
Pictures for illustra tive purpos es
E
LECTRO
V
AP
RTH-LC
Setting up
Before putting your humidifier in operation,
please make sure that your installation is
in conformity w ith the manufacturer’s
technical specifications.
•
Remov e the blocking ring from the cylinder.
•
Open the water valve of the main water line.
•
Switch on the main power supply contactors
(voltage and command).
•
The power-on light
must be illuminated.
•
Switch on I the I/O (on/off) rocker switch.
•
The display will default to show the rate of steam
produced. You are in the user’s information menu.
DISPLAY OPERATION :
1 Pressing the select button repeatedly will rotate
between the three main pages.
2 Enter the derised menu by pressing the up or down
button.
•
As soon as the humidifier is prompted by the
regulator, the humidity sensor or the humidistat, the
contactor of the DIN rail turns on and the power
heating is on
(the steam production LED is
illuminated)
•
When the humidifier is switched on, the inlet valve
opens and the boiler is flushed with water. The
heating elements then heat the water up and after
about 10 minutes (the heating time depends on the
model of humidifier and the water conductivity), the
humidifier steams up.
Humidifier identif ication label stuck under and shielded by the
front panel polycarbonate label.
This identification label provides the following information :
RTH-LC model, unit serial number, command v oltage, power
voltage, number of power phases, intensity and electrical power.
1
2
2
1
Blue anti-bubble hose
inside filling cup