b) Ask someone to frequently check the house during
the cold weather season to make sure that there is
sufficient heat to prevent the pipes from freezing.
Tell this person to call an emergency number if re-
quired.
2
INSTALLATION
This furnace is a true multi-position unit, in that it will
function in an upflow, downflow or horizontal configura-
tion to the left or the right. Only a few modifications are
required during installation to change from one position
to another. The unit is shipped in the upflow configura-
tion and instructions as to how to change to the other
positions are included in this manual.
The unit requires a 120/240 - 208 VAC power supply to
the control panel, thermostat hook-up as shown on the
wiring diagram.
2.1
POSITIONING THE FURNACE
WARNING
FIRE AND EXPLOSION HAZARD
The furnace must be installed in a level position,
never where it will slope toward the front.
Do not store or use gasoline or any other
flammable substances near the furnace.
Non-observance of these instructions will poten-
tially result in death, bodily injury and/or property
damage.
WARNING
This furnace is not watertight and is not designed
for outdoor installation.
It must be installed in
such a manner as to protect its electrical compo-
nents from water. Outdoor installation will lead to
a hazardous electrical condition and to premature
failure of the equipment.
If the furnace is installed in a basement or on a dirt
floor, in a crawl space for example, it is recommended to
install the unit on a cement base 2.5 cm to 5.0 cm (1” to
2”) thick.
In addition, the heater should also be located close to the
center of the air distribution system.
2.2
CLEARANCES TO
COMBUSTIBLE MATERIAL
2.2.1
Heating unit
The furnace is approved for zero clearance to com-
bustible material regardless of the heating capacity.
2.2.2
Supply air ducts
Ducts can be installed with a zero clearance to com-
bustible material.
2.3
CONFIGURATIONS
This furnace requires suitable ductwork.
2.3.1
Upflow installation
The return duct may be installed to the back, to the bot-
tom, on the left side or on the right side of the unit. The
supply duct shall be installed on the top of the unit. Care
should be taken not to damage the wires inside, while
cutting the opening. Instal the filter rack that is supplied
with the unit. It is also recommended to install the blower
door before handling or moving the unit. Refer to Figure
1 for additional details.
Figure 1: Upflow Configuration
2.3.2
Downflow installation
The return duct may be installed to the back, on the left
side, on the right side or under the unit. The supply duct
shall be installed on the top of the unit.
When the furnace is installed in the downflow position on
a combustible floor, the downflow base DFB-SUP can be
used. Refer to Figure 2 and the installation instructions
provided with the base.
Figure 2: Downflow Configuration
2.3.3
Horizontal installation
The return duct may be installed to the back, on the left
side, on the right side or under the unit. The supply duct
shall be installed on the top of the unit.
When the furnace is installed in the horizontal position,
3