background image

 

 

7

 

CAUTION 

When  a  0.75  USGPH  or  smaller  nozzle  is  used,  a  10  micron 
or  finer  filter,  must  be  installed  on  the  oil  supply  line  to  the 
furnace inside the building where the unit is located. 

This is a requirement in order for the heat exchanger warranty 
to remain in force. 

Check  your  local  codes  for  the  installation  of  the  oil tank and 
accessories. 

At  the  beginning  of  each  heating  season  or  once  a  year, 
check the complete oil distribution system for leaks. 

Ensure  that  the  tank  is  full  of  clean  oil.  Use  No.1  or  No.2 
Heating Oil (ASTM D396 U.S.) or in Canada, use No.1 or No.2 
Furnace Oil. 

A  manual  shut-off  valve  and  an  oil  filter  shall  be  installed  in 
sequence from tank to burner. Be sure that the oil line is clean 
before  connecting  to  the  burner.  The  oil  line  should  be 
protected  to  eliminate  any  possible  damage.  Installations 
where  the  oil  tank  is  below  the  burner  level  must  employ  a 
two-pipe  fuel supply system with an appropriate fuel pump. A 
rise  of  2.4  m  (8')  and  more  requires a two stage pump and a 
rise  greater  than  4.9  m  (16')  an  auxiliary  pump.  Follow  the 
pump  instructions  to  determine  the  size  of  pipe  needed  in 
relation to the rise or to the horizontal distance. 

2.9 

DUCTING 

WARNING 

Poisonous carbon monoxide gas hazard. 

DO  NOT  draw  return  air  from  inside  a  closet  or  utility 
room. Return air MUST be sealed to the furnace casing. 

Failure  to  properly  seal  ducts  can  result  in  death,  bodily 
injury and/or property damage. 

The  ducting  must  be  designed  and  installed  according  to 
approved  methods,  local  and  national  codes  as  well  as  good 
trade practices. 

When  ducting  supplies  air  to  a  space  other  than  where  the 
furnace  is  located,  the  return  air  must  be  sealed  and  also  be 
directed to the space other than where the furnace is located. 

2.9.1 

Air filter 

A  properly  sized  air  filter  must  be  installed  on  the  return  air 
side of the unit. Refer to the Technical Specifications, p.13, for 
the  correct  dimensions.  Also  refer  to  Section  2.3  and  the 
instructions supplied with the filter. 

2.10 

SUPPLY AIR ADJUSTMENT (4 SPEED 
MOTOR) 

On units equipped with 4-speed blower motors, the supply air 
must be adjusted based on heating/air conditioning output and 
the static pressure of the duct system. For the desired air flow 
refer to the following table as well as the air flow tables based 
on  static  pressure  in  the  Technical  Specifications  section  of 
this manual. 

Table 1:  Blower speed adjustments (heating mode, 4 
speed motor) 

HEATING 

CAPACITY 

(USGPH) 

STATIC 

PRESSURE 

(W.C.) 

RECOMMENDED 

BLOWER 

SPEED 

0.90 

0.

25” 

MED-LOW 

0.90 

0.50

” 

MED-LOW 

1.10 

0.25” 

MED-HIGH 

1.10 

0.50” 

MED-HIGH 

 

Table 2:  Blower speed adjustments (A/C mode, 4 speed 
motor) 

A/C CAPACITY 

(TONS) 

RECOMMENDED 
BLOWER SPEED 

3.0 

LOW 

3.5 

MED-LOW 

4.0 

MED-HIGH 

5.0 

HIGH 

To effect the adjustment, the RED (for heating) and BLUE 
(for cooling and heat pump) wires can be changed on the 
motor. Also, refer to the position of the wires on the 
electronic board of the unit and consult the wiring 
diagrams. If the heating and air conditioning speeds are 
the same, the RED wire must be moved to “UNUSED 
LEADS” on the electronic board and the jumper provided 
with the BLUE wire must be used between the “HEAT” 
and “COOL” terminals. 

The  blower  start/stop  delays  can  be  adjusted  by 
positioning  the  DIP  switches  on  the  electronic  board  as 
shown 

in 

the 

following 

figures. 

However, 

the 

recommended  adjustments  are  60  seconds  blower  ON 
delay and 2 minutes blower OFF delay.

 

Figure 5:  Blower "OFF" delay - Board #ST9103A 

 

Figure 6:  Blower start / stop delays - Board #1158 

 

Содержание OLR154F20A

Страница 1: ...RMATION IN THIS MANUAL FOR THE INSTALLATION SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE UNIT FOR FUTURE REFERENCE HOMEOWNER PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE REFERENCE At...

Страница 2: ...ly air Temperature Rise Test 10 3 3 8 Limit Control Check 10 3 3 9 Restart after burner failure 10 4 MAINTENANCE 10 4 1 CLEANING THE HEAT EXCHANGER 10 4 2 CLEANING THE BLOCKED VENT SHUT OFF DEVICE BVS...

Страница 3: ...formation such as the model and serial numbers of the furnace WARNING Installations and repairs performed by unqualified persons can result in hazards to them and to others Installations must conform...

Страница 4: ...re the ambient and return air temperatures are above 15 C 60 F In addition the furnace should be installed as closely as possible to the vent so that the connections are direct and kept to a minimum T...

Страница 5: ...ired for Riello burners Refer to the burner control instruction manual and markings for proper adjustment of the post purge delay 2 5 VENTING WARNING Poisonous carbon monoxide gas hazard Never install...

Страница 6: ...adequate supply of combustion air It is common practice to assume that older homes have sufficient infiltration to accommodate the combustion air requirement for the furnace However home improvements...

Страница 7: ...ated the return air must be sealed and also be directed to the space other than where the furnace is located 2 9 1 Air filter A properly sized air filter must be installed on the return air side of th...

Страница 8: ...heating or air conditioning mode This signal can be used to activate an electronic air cleaner that is not equipped with an air flow switch If the cleaner is equipped with an air flow switch the S te...

Страница 9: ...of the oil piping and pump Slowly close and tighten the bleed screw Once closed the flame will light up 3 3 2 Pressure adjustment The oil pressure must be adjusted according to the Technical Specifica...

Страница 10: ...burner should restart after a few minutes The time required for the restart also depends on the adjustment of the blower OFF delay 3 3 9 Restart after burner failure 1 Set the thermostat lower than r...

Страница 11: ...uction inside the heat transfer tube 7 Re mount lock and fasten the control box with the 2 screws removed in step 4 8 Re attach the assembly cover with the screws removed in step 2 9 Re establish powe...

Страница 12: ...vice telephone Day Night Dealer name and address START UP RESULTS Nozzle Pressure lb po2 Burner adjustments Primary air Fine air Drawer Assembly CO2 Smoke scale Bacharach Gross stack temperature F Amb...

Страница 13: ...n 87 5 86 2 87 5 86 2 Volts Hertz Phase Rated current Amps Minimum ampacity for wire sizing Amps Max fuse size Amps Control transformer VA External control power available Heating VA Cooling VA Heatin...

Страница 14: ...Time ShortRun On Delay CFM Level Time Off Delay CFM Level Time A 1 OFF 2 OFF 0 90 13 45 sec 44 30 sec 38 3 min B 1 ON 2 OFF 1 10 13 30 sec 44 30 sec 38 3 min C 1 OFF 2 ON 1 10 13 30 sec 50 30 sec 38...

Страница 15: ...WITH AIR FILTER Table 10 Minimum clearances from combustible material LOCATION APPLICATION CLEARANCES combustible materials RECOMMANDED ACCESS FOR SERVICE FURNACE 2 54 cm 1 0 6 m 24 SUPPLY PLENUM WIT...

Страница 16: ...16 Figure 7 Furnace Dimensions...

Страница 17: ...17 Figure 8 Wiring Diagram 4 Speed Motor PSC...

Страница 18: ...18 Figure 9 Wiring Diagram Variable Speed Motor ECM...

Страница 19: ...19 Figure 10 Parts List With 4 Speed motor PSC B50095B...

Страница 20: ...TERIOR 33 F06F015 ZINC WASHER 1 7 16 34 Z99F061 SIGHT GLASS FOR HEAT EXCHANGER 35 Z06G001 BLOCKED VENT SHUT OFF BVSO 225 36 B03675 GASKET SMOKE OUTLET 37 B03765 CLEAN OUT ASSEMBLY Item 36 included 38...

Страница 21: ...21 Figure 11 Parts List With variable speed motor ECM B50096C...

Страница 22: ...ELECTRICAL BOX COVER Panel only 32 B03118 01 ELECTRICAL KIT BVSO EXTERIOR 33 F06F015 ZINC WASHER 1 7 16 34 Z99F061 SIGHT GLASS FOR HEAT EXCHANGER 35 Z06G001 BLOCKED VENT SHUT OFF BVSO 225 36 B03675 G...

Страница 23: ...NICIEN UTILISER LES RENSEIGNEMENTS DANS CE MANUEL POUR L INSTALLATION ENTRETIEN DE L APPAREIL ET GARDER LE DOCUMENT PR S DE L UNIT POUR R F RENCES ULT RIEURES PROPRI TAIRE S V P GARDER CE MANUEL PR S...

Страница 24: ...rture de ventilation dans la porte du placard 4 Figure 2 Branchement du thermostat Chauffage et climatisation Unit avec moteur 4 vitesses 5 Figure 3 Branchement du thermostat Chauffage et Climatisatio...

Страница 25: ...onduit comment le changer une fois par ann e iv Le filtre air comment le changer v rifier mensuellement et nettoyer ou changer si n cessaire g Avant d appeler pour le service prendre en note les rense...

Страница 26: ...s doit tre utilis e 2 1 EMPLACEMENT MISE EN GARDE Risque d incendie ou d explosion L appareil doit tre install au niveau Ne jamais installer avec une inclinaison vers l avant Ne pas ranger ou utiliser...

Страница 27: ...ils d origine de l appareil de chauffage central utilisez seulement du fil de cuivre r sistant la m me temp rature que les fils d origine 2 3 INSTALLATION DU THERMOSTAT L installation d un thermostat...

Страница 28: ...ajustement 2 5 VACUATION MISE EN GARDE Risque d empoisonnement par monoxyde de carbone Lire et suivre toutes les instructions contenues dans cette section Ne jamais installer un volet manuel sur le tu...

Страница 29: ...usqu la fin du cycle de refroidissement Si le fonctionnement n est pas conforme APPELER UN TECHNICIEN QUALIFI 2 7 APPROVISIONNEMENT EN AIR DE COMBUSTION ET VENTILATION MISE EN GARDE Risque d empoisonn...

Страница 30: ...oir avec une pompe appropri e une l vation de 2 4 m 8 et plus requi re une pompe deux stages et une l vation de plus de 4 9 m 16 une pompe auxiliaire Suivre les directives d installation de la pompe p...

Страница 31: ...fonction de la puissance de chauffage et de climatisation Les d lais de d part et d arr t du ventilateur en mode chauffage doivent aussi tre ajust s en positionnant les interrupteurs DIP du contr le...

Страница 32: ...ence Moteur vitesse variable ECM Si le moteur de soufflerie ECM s av re d fectueux et qu un rechange n est pas disponible imm diatement vous pouvez remplacer temporairement le moteur de la soufflerie...

Страница 33: ...dans le tuyau de raccordement environ 18 pouces de la bride d vacuation de la fournaise Pour les installations avec une vacuation murale utiliser l orifice pr vu cet effet 2 Suite un d part froid lais...

Страница 34: ...azout accumul des vapeurs de mazout ou que la chambre combustion est tr s chaude 4 ENTRETIEN MISE EN GARDE Risque de d charge lectrique Avant d effectuer des travaux d entretien FERMER l alimentation...

Страница 35: ...rupteur thermique Un interrupteur thermique endommag doit tre remplac 6 Nettoyer et enlever toute accumulation de salet ou obstruction de l int rieur du tube de transfert de chaleur 7 Remonter verroui...

Страница 36: ...dresse du technicien de service R SULTAT DU TEST DE MISE EN MARCHE Gicleur Pression lb po2 Ajustements du br leur Bande principale Bande secondaire Position de la t te CO2 Indice de fum e Bacharach Te...

Страница 37: ...103 et des lois am ricaines 87 5 86 2 87 5 86 2 Volts Hertz Phase Consommation Amp Amp minimum pour grosseur du fil Amp Fusible max Amp Contr le du transformateur VA Courant disponible contr les exter...

Страница 38: ...n Niveau PCM Temps D lai Off Niveau PCM Temps A 1 OFF 2 OFF 0 90 13 45 sec 44 30 sec 38 3 min B 1 ON 2 OFF 1 10 13 30 sec 44 30 sec 38 3 min C 1 OFF 2 ON 1 10 13 30 sec 50 30 sec 38 3 min D 1 ON 2 ON...

Страница 39: ...XTERNE AVEC FILTRE AIR Table 10 D gagement minimum mat riaux combustibles EMPLACEMENT APPLICATION D GAGEMENTS mat riaux combustibles ACC S RECOMMAND POUR L ENTRETIEN FOURNAISE 2 54 cm 1 0 6 m 24 PL NU...

Страница 40: ...18 Figure 7 Dimensions de la fournaise...

Страница 41: ...____________________________________________________________________________________ 19 Figure 8 Diagramme lectrique Moteur 4 vitesses PSC...

Страница 42: ...20 Figure 9 Diagramme lectrique Moteur vitesse variable ECM...

Страница 43: ...____________________________________________________________________________________ 21 Figure 10 Liste de pi ces Avec moteur 4 vitesses PSC B50095B...

Страница 44: ...DELLE ZINC 1 7 16 34 Z99F061 OEIL DE REGARD POUR CHANGEUR 35 Z06G001 DISPOSITIF D ARR T BVSO 225 36 B03675 GARNITURE SORTIE FUM E 37 B03765 ASS BRIDE DE NETTOYAGE Comprend item 36 38 B03762 ASS COUVER...

Страница 45: ...____________________________________________________________________________________ 23 Figure 11 Liste de pi ces Avec moteur vitesse variable ECM B50096C...

Страница 46: ...ITE LECTRIQUE Panneau seulement 32 B03118 01 KIT LECTRIQUE BVSO EXT RIEUR 33 F06F015 RONDELLE ZINC 1 7 16 34 Z99F061 OEIL DE REGARD POUR CHANGEUR 35 Z06G001 DISPOSITIF D ARR T BVSO 225 36 B03675 GARNI...

Отзывы: