16” Burner Tube
3m Primary Combustion Chamber
NOTE
: Type varies depending on
model, Refer to model specification
chart on page 2.
Radiant Emitter Tube
NOTE
: If applicable, placement of
Secondary Combustion Chamber.
Refer to model specifcation chart on
page 2 (45 kW models only).
Burner Control Box
Radiant Emitter
Tube(s)
Suspension
Point
Burner Control Box
Suspension Points
Suspension
Point
Stainless Steel Tube Clamp
(50-60 kW models only)
711
mm
269
2m
m
2946
mm
Suspension Point
3.0
Installation
- GTD Series Installation, Operation, Maintenance and Parts Manual
Hanger Placement and Suspension
Figure 3.4
•
Heater Suspension Layout
Heater Mounting Requirements and Weights
NOTE:
A sticker identifying the combustion chamber(s)
is located on the swaged end of the tube(s).
12
GTD Model
Length (M)
Dimension
Straight Config.
(mm)
Tube & Reflector
Suspension P
oints
Contr
ol Bo
x
Stabiliz
er
Shipping
W
eight
(kg)
Stainless Steel
Ship
W
eight (kg)
Chain Set Qty
.
Straigt Config.
Chain Set Qty
.
U-T
ube Config.
Optional Brass
Kn
uc
kles (P/N:
BK)
Optional Single
Mount Brac
ket
(P/N:
SMB)
U Config.
Onl
y.
6M
6580
3
2
54.5
66.0
5
6
3
2
9M
9530
4
2
73.0
88.5
6
7
4
3
12M
12470
5
2
86.5
107.0
7
8
5
3
15M
15420
6
2
107.0
132.0
8
9
6
4
18M
18360
7
2
102.5
150.0
9
10
7
4
2946
mm