
Document:
DS-M8--OPM-1.0M
Page 12 of 19
© DESAY INTELLIGENT CO. LTD.
T
+752 2617 333
WWW.DESAYOPTO.COM
3.1.1 Rigging/Hanging Installation
When a screen must be rigged, a structure must be placed before the building of the actual screen can
start. The screen engineer makes sure that the structure is correctly built and that it is intended for the
correct weight and size of the screen. The screen engineer must make the same checks for the beam,
beam trolleys, motors or any other devices that form a part of the structure or the lifting devices.
Consult for maximum height of screen in next section.
Notes:
1)A base can never be used without a truss.
2)The motor must always be secured with a steel cable or a strap.
3)Hanging structure verified with TUV strength test 1.8tons
3.1.1a To rig a single column of a screen
1
Attach the hanging bracket to the hanging motor (with turnbuckle) and hoist it up.
2
Lock and secure the panel onto the hanging bracket with the locking system.
3
Repeat for all the columns.
4
Place the columns next to each other and lock the panels horizontally.
5
Bring the next panel straight under the row that is already hanging on the motor.
6
Lock and secure the panel on the hanging panel. Repeat for other columns and lock
horizontal. Finally hoist up the 2 rows of panels. Continue this process until the screen column
is finished.
3.1.1b To rig the screen in row direction
The side lock is used to lock the columns of panels next together to form the rows.
Safety while in use:
When the installation is finished,
steel cables or straps can secure the columns
. Cables or straps
must be attached to the screen so that it can rock back and forth, but cannot move to far to the front
or to the back. Make sure everything is locked & secured.
double stacking