115425-01
7
7
For more information, visit www.desatech.com
TESTING BURNER FOR LEAKS
1.
Generously apply noncorrosive leak detection fl uid to all
connections.
WARNING: Never check for gas leaks with
open fl ame.
INSTALLATION
Continued
Figures 16 & 17 - Installing Logs. (Number and style of your
logs may vary)
INSTALLATION
Testing Burner for Leaks
Adding Pan Material
Installing the Grate and Logs
2. Light the burner with the shutoff valve no more than half open
and holding a match slightly in front of the pan (see
Lighting
Instructions,
page 10).
3. Inspect all connections for bubbles, raw gas odor, or fl ame from
any area other than the burner (leaks). If leaks are detected,
shut off the gas valve immediately. Tighten, or reassemble the
loose connection(s) using pipe joint compound until burner
system is leak free.
4. When the burner is tested and leak free, observe the individual
tongues of fl ame on the burner. Make sure that all ports are clear
and producing fl ame evenly across the burner. If any ports ap-
pear blocked, clear them by removing the burner manifold and
reaming the ports with a modifi ed paper clip or other suitable
tool.
5. When
fi nished testing, turn the gas shutoff valve OFF to ex-
tinguish all fl ames.
ADDING PAN MATERIAL
1. Open the bag of glowing embers and spread it evenly over the
burner ramp.
2. Open the small bag of platinum embers and place them ran-
domly throughout the ember bed; more heavily near the front
of the ramp.
INSTALLING THE GRATE AND LOGS
1. Place the grate over the burner pan where the two outer hori-
zontal supports on the grate fi t into the two pan positioning
tabs on the outer edges of the pan.
2. Place
the
large
back log on the grate at the top tier (rear) of
the ramp. (see Figure 16).
3. Figures 16 and 17 show a suggested log arrangement, however
you may arrange the logs as you wish. Leave as much open
space between logs as possible to minimize fl ame impingement
and sooting. Note: Logs may chip if they are handled roughly
or if hit together while being placed.
Figure 16 - Suggested log
arrangement
Figure 17 - Completed
logset