background image

 

 

 

 

 

To ensure stability of the product, the baseplate of the installation frame must be covered with a 
minimum of 600, 450 or 300 mm of dry sand up to the minimum dry sand level mark. Only do this 
after the post has been anchored to the frame.   

 

 

Отзывы: