11 Appendix
11.1 Maintenance Log Book CAIR
plus
Notice!
Observe maintenance procedures for air handling units as these are critical for unit service life.
Due to use of various chemical substances and cleaning agents for sanitizing and cleaning, unit surfaces
may be affected.
•
Report all corrosion on unit surfaces to your installer without delay!
Commissioning date:
Commissioned by:
Maintenance
frequency
Unit part
Checked
O.K.
no
t O
.K.
Comment
Date
Signature
Month 1 following
commissioning
Heat Exchanger
Fan assembly
Refrigeration plant
Control
Panels
Filters
Condensate pan
Damper blades
Other components
Defects/damage was directly communicated to company:
on (date):
Defect/damage was repaired by:
on:
Month 2 following
commissioning
Heat Exchanger
Fan assembly
Refrigeration plant
Control
Panels
Filters
Condensate pan
Damper blades
Other components
Defects/damage was directly communicated to company:
on (date):
Defect/damage was repaired by:
on:
Month 3 following
commissioning
Heat Exchanger
Fan assembly
Refrigeration plant
Control
Panels
Filters
Condensate pan
Damper blades
Other components
Defects/damage was directly communicated to company:
on (date):
Defect/damage was repaired by:
on: