Commissioning and Maintenance
CAIR
plus
68
PR-2009-0096-GB • Subject to modifications • R8-10/2015
8.4.5 Commissioning and Maintenance of EC fans
•
Please also observe the instructions of the component manufacturer!
8.5
Filter assembly
8.5.1 Commissioning of filter assembly
DANGER!
•
Please consider the
safety instructions
on page 5 and page 55ff when performing
all the described activities
!
Complete the following commissioning steps:
•
Check filter assembly and installed filters for damage.
•
Check that filter assembly is correctly fitting in the mounting frame.
•
If required, clean installation dust before the filter assembly and unit parts in the
direction of airflow.
•
Repeat cleaning before installing filters from grade F9 into the air handling unit and
ductwork.
•
Put the fan into service and take readings of the initial pressure difference (if
available).
Hazardous voltage can result in death!
Waiting time at least 3 minutes!
9
Due to the use of condensers, danger of death continues even after switching off
the unit by directly touching live components which are still live owing to fault
states.
•
Therefore only remove or open the controller casing after a 3-minute
waiting time after the unit has been disconnected to the mains supply line!
Danger due to automatic restart!
9
The fan/engine can be automatically switched on and off for functional reasons.
9
After a power failure or power supply breakdown, the fans automatically restart
when mains power returns again!
•
Wait until the fans have come to a standstill before approaching them.
9
With external rotor motors, the external rotor rotates during operation!
Risk of burns due to hot surfaces!
9
Temperatures above 85 °C can occur on the motor surfaces, particularly on the
controller casing!
9
Severe burns can be the consequence.
ELECTRICAL HAZARD AND DANGER OF ROTATING UNIT PARTS WITH
SHARP EDGES!
•
OBSERVE PERSONAL PROTECTION MEASURES
•
Please consider the safety instructions on page 5 and page 55ff when
performing all the described activities!