background image

I-1048 

 

Page 4 of 7 

Rev. A-39406      11/27/13 

 
 

Squeeze Tube Installation 

Install the squeeze tube by removing the pump cover by depressing the tab on the front of the 
unit. (1) Place one end of the squeeze tube on the left side of the pump in the slot provided. (2) 
Wrap the squeeze tube around the rollers of the pump. (3) Then stretch the squeeze tube so that 
the end of the tube goes into the slot provided. (4) Replace the cover on the pump.  

 

 

 

 

 
 
 

 
 
 
 
 

        (1)   

 

(2)   

 

(3)   

 

   (4) 

Close Pump Head 

The pump head has an added feature which will help to ensure the pump head is retained 
properly.  When pushing the pump head on, be sure to push the pump head on tightly so that the 
tab is grasping the pump head.  If the tab is not fully engaged, there is a possibility the pump 
head becoming dislodged. 
 
 
 
 
 

 
 
 
 

 

   Correct  

 

            Incorrect 

Operation  

Programming the Dispenser  

CAUTION:

  When the unit is powered the first time, a rechargeable 

display back up battery begins charging.  When fully charged it 
provides approximately 200 hours of reserve time before the display 
and program may be lost. If the unit loses power, it will not lose the 
program for 200 hours, but it will not run the pump from the 
rechargeable display back up battery and will not dispense chemical. If 
the unit becomes unplugged from the wall for a short amount of time, 
plugging the unit back in will not affect the programming done to the 
unit.  

 

Pump head 

Push tab up 

Содержание SQUIRT DC

Страница 1: ...l city county parish provincial or other agencies It is possible that electrical codes and regulations require that a certified electrical contractor or engineer perform the electrical installation Fo...

Страница 2: ...JACO 2505 25 220 1 81 16 3 25 160 20 SUPER TUBE 81 312 1 81 231 4 EPDM CONE Operational Requirements For indoor use only Main Power 8 D CELL BATTERIES NOT INCLUDED Case Material ABS Product Weight 1 1...

Страница 3: ...44 116 2 8 X 3 8 HI LO SCREW 8 81 18 1 6 X 3 8 HI LO SCREW 9 83 16 2 VELCRO PATCH Installation Mount the unit no higher than 6 feet from the chemical container Take into account the proximity to the c...

Страница 4: ...sure to push the pump head on tightly so that the tab is grasping the pump head If the tab is not fully engaged there is a possibility the pump head becoming dislodged Correct Incorrect Operation Prog...

Страница 5: ...events can be programmed 1 Press and release the TIMER button to enter the programming mode The event number will be in the bottom left corner Note To program a full event a pump start time and stop...

Страница 6: ...ck up tubing is not sealed to the squeeze tube fitting 1 Check the tubing from the chemical container to the pump head for leaks by feeling the tubing for chemical that has leaked out Replace the tube...

Страница 7: ...fective units or parts should be returned to the factory with transportation prepaid If inspection shows them to be defective they will be repaired or replaced without charge F O B factory DEMA assume...

Отзывы: